Vegetation encroachment risk
Prioritize trim spend by predicted outage cost.
Included in the Utilities pack
$99 /seat/moJoin the waitlistThe pack includes 14 other ready-made workflows.
What it does
Veg-trim budgets never cover everything. This template scores every distribution span by vegetation encroachment risk: LiDAR-derived canopy height, recent outage history, fire-weather index, and downstream customer count. Output: a ranked work order list the field crew pulls from on Monday morning.
- Data it uses
- USGS 3DEP LiDAR
- Operator distribution feeders
- Outage history (internal)
- NOAA fire-weather
- Specialists on it
- Remote Sensing Specialist, Field Biologist, Data Engineer
The steps
Each step runs in order and shows its work as it goes. Open a step to read exactly what it asks for.
1Canopy proximity score
Compute, for each span in {{spans_layer}}, the maximum canopy height within 10m of the span centerline from {{canopy_raster}}. Score 100 if max > conductor clearance threshold, scaled down to 0 below.2Outage history score
Spatial join {{outages_layer}} (last 12 months, vegetation-caused) to spans. Score: normalized count of vegetation outages per span.3Fire-weather score
Zonal Statistics MAX of {{fire_wx_raster}} per span. Score: normalize to 0-100.4Composite + rank
Composite RISK_SCORE = 0.4*canopy + 0.35*outage_history + 0.25*fire_wx. Output top 5% of spans as a ranked work-order list with downstream customer count.
More in the Utilities pack
- Hydraulic pressure deficiencyFind every node below 20 psi in your water network.3 steps
- Storm outage post-mortemGenerate the regulator-facing post-mortem in one hour.5 steps
- Smart-meter rollout planningSequence your AMI rollout for max early ROI.5 steps
- EV-charger demand forecastForecast every neighborhood's 2030 EV-charger demand.5 steps
- Distribution transformer load riskFind which transformers saturate first as EV adoption grows.5 steps
- Solar interconnection queue triageTriage your interconnection backlog by feasibility.5 steps