Ready-made workflow in the Utilities pack
Solar interconnection queue triage
Triage your interconnection backlog by feasibility.
Included in the Utilities pack
$99 /seat/moJoin the waitlistThe pack includes 14 other ready-made workflows.
What it does
ISO interconnection queues are clogged. This template scores every queued project on substation headroom × line-distance × transmission losses × landowner risk, and ranks by likely time-to-energization. Output: queue prioritization for the interconnection team.
- Data it uses
- ISO interconnection queue
- Substation inventory
- Transmission line layer
- Specialists on it
- Data Engineer, GIS Analyst
The steps
Each step runs in order and shows its work as it goes. Open a step to read exactly what it asks for.
1Validate queue and substation capacity fields
Verify {{queue}} layer contains project MW capacity, project type (solar/wind/storage/battery), and queue entry date. Report total queued capacity in MW by project type and the queue date range. Verify {{substations}} layer has rated_kva and current_load_kw fields for headroom calculation — if these fields are absent, the headroom scoring step will default to a distance-only ranking and this limitation must be clearly flagged in the output summary.2Score substation headroom
For each queued project, identify nearest substation; score headroom.
3Score line distance + losses
Near analysis project to transmission line; compute estimated losses.
4Triage queue
Composite TIME_TO_ENERGIZATION = f(headroom, line_distance, losses, landowner_risk). Rank.
5QA score distribution and assemble citations
Report capacity-weighted average TIME_TO_ENERGIZATION score. Flag projects larger than 500 MW — these typically require new transmission facilities and their triage score is less reliable than for smaller projects; annotate these separately in the output. Report the top-10 feasible projects with their MW capacity, nearest substation, and headroom percentage. Assemble citation block: ISO queue data version and download date, substation inventory GIS source and export date, transmission line layer source and vintage.
More in the Utilities pack
- Vegetation encroachment riskPrioritize trim spend by predicted outage cost.4 steps
- Hydraulic pressure deficiencyFind every node below 20 psi in your water network.3 steps
- Storm outage post-mortemGenerate the regulator-facing post-mortem in one hour.5 steps
- Smart-meter rollout planningSequence your AMI rollout for max early ROI.5 steps
- EV-charger demand forecastForecast every neighborhood's 2030 EV-charger demand.5 steps
- Distribution transformer load riskFind which transformers saturate first as EV adoption grows.5 steps