Ready-made workflow in the Utilities pack
Distribution transformer load risk
Find which transformers saturate first as EV adoption grows.
Included in the Utilities pack
$99 /seat/moJoin the waitlistThe pack includes 14 other ready-made workflows.
What it does
Distribution transformers age into saturation as EV adoption + heat-pump electrification grow. This template scores every transformer by current loading × downstream EV-charger forecast × HVAC mix, ranks by predicted saturation year, and feeds the capex plan.
- Data it uses
- Operator transformer inventory
- AMI load data
- TAZ-level EV forecast (from prior template)
- Specialists on it
- Data Engineer, GIS Analyst
The steps
Each step runs in order and shows its work as it goes. Open a step to read exactly what it asks for.
1Validate transformer inventory fields and current loading
Verify {{transformers}} layer exists with rated_kva, install_year, and current_peak_load_kw fields. Report null rates for each required field. Compute current loading percentage distribution (current_peak_load_kw / (rated_kva × 0.8 power-factor adjustment)). Flag transformers already above 90% of rated capacity — these are immediately critical and must appear in the output regardless of EV growth trajectory, not only when a future saturation year is calculated.2Join EV forecast
Spatial join transformers to TAZ EV forecast.
3Compute saturation year
For each transformer: SATURATION_YEAR = year when (current_load + EV_growth + HVAC_growth) > rated_capacity.
4Rank capex priority
Sort by SATURATION_YEAR ascending. Output capex-plan-ready CSV.
5QA saturation distribution and assemble citations
Verify SATURATION_YEAR distribution is plausible — if more than 20% of transformers show saturation before 2027, review current_peak_load_kw inputs for data quality issues (AMI data lag, meter misassignment, or a data extraction error). Report the implied capital investment total based on standard transformer replacement cost × units saturating by year. Assemble citation block: EV forecast layer source template name and run date, transformer inventory GIS export date and SCADA system name, growth-rate model and vintage used.
More in the Utilities pack
- Vegetation encroachment riskPrioritize trim spend by predicted outage cost.4 steps
- Hydraulic pressure deficiencyFind every node below 20 psi in your water network.3 steps
- Storm outage post-mortemGenerate the regulator-facing post-mortem in one hour.5 steps
- Smart-meter rollout planningSequence your AMI rollout for max early ROI.5 steps
- EV-charger demand forecastForecast every neighborhood's 2030 EV-charger demand.5 steps
- Solar interconnection queue triageTriage your interconnection backlog by feasibility.5 steps