Ready-made workflow in the Utilities pack
Smart-meter rollout planning
Sequence your AMI rollout for max early ROI.
Included in the Utilities pack
$99 /seat/moJoin the waitlistThe pack includes 14 other ready-made workflows.
What it does
AMI rollouts must sequence by load priority, communications reach, and field crew geography. This template scores every premise on three axes and outputs a recommended phase-1 / phase-2 / phase-3 sequence with daily crew loadings.
- Data it uses
- Operator premise inventory
- AMI tower locations
- Census ACS
- Specialists on it
- Data Engineer, GIS Analyst
The steps
Each step runs in order and shows its work as it goes. Open a step to read exactly what it asks for.
1Validate premise and tower layer fields
Verify {{premises}} layer exists with premise_id and service_class fields (residential / commercial / industrial). Report total premise count and service-class distribution. Verify {{towers}} layer has a comm_range_ft or comm_range_m field — if missing, default the communications buffer radius to 1,500 ft and flag in output metadata that the default was applied rather than a measured value. Report tower count and geographic coverage relative to the service territory extent.2Score comms reach
Buffer towers by comm range; spatial join premises.
3Score load priority
Score each premise by historical kWh + commercial vs residential.
4Sequence phases
Composite SCORE; rank into phase-1 / phase-2 / phase-3. Daily crew loadings.
5QA coverage gaps and assemble citations
Report the percentage of premises outside all tower communications ranges — if this exceeds 15%, flag that additional tower placement will be required before rollout sequencing can be finalized for those areas. Report Phase-1 / Phase-2 / Phase-3 counts and the implied daily crew loading per phase against the field crew capacity input. Assemble citation block: AMI tower inventory data source and export date, ACS vintage year and table IDs used for premise classification, and all source URLs.
More in the Utilities pack
- Vegetation encroachment riskPrioritize trim spend by predicted outage cost.4 steps
- Hydraulic pressure deficiencyFind every node below 20 psi in your water network.3 steps
- Storm outage post-mortemGenerate the regulator-facing post-mortem in one hour.5 steps
- EV-charger demand forecastForecast every neighborhood's 2030 EV-charger demand.5 steps
- Distribution transformer load riskFind which transformers saturate first as EV adoption grows.5 steps
- Solar interconnection queue triageTriage your interconnection backlog by feasibility.5 steps