Ready-made workflow in the Utilities pack
Stray Voltage Complaint Cluster Analysis
Find network segments causing injury risk before the attorney does.
Included in the Utilities pack
$99 /seat/moJoin the waitlistThe pack includes 14 other ready-made workflows.
What it does
Geocodes service complaint records, runs DBSCAN cluster analysis, joins clusters to the distribution network, and correlates with neutral-to-earth voltage measurement history — producing the prioritized inspection queue your safety officer needs the day after the first injury report.
- Data it uses
- Customer service complaint records (tabular upload from CRM)
- Distribution network GIS
- Neutral-to-earth voltage measurement records (if available)
- Specialists on it
- Infrastructure Engineer, Risk & Exposure Analyst, GIS Analyst
The steps
Each step runs in order and shows its work as it goes. Open a step to read exactly what it asks for.
1Validate and categorize complaint records
Upload and validate the service complaint record file — filter to stray voltage, electric shock, tingling sensation, tingle voltage, or hot ground complaint categories. If the CRM does not have a stray voltage category, also include any complaint containing keywords: 'shock', 'tingle', 'buzz', 'metallic taste', 'dog', 'animal' in the complaint description (animals are often the first to detect stray voltage due to lower perception thresholds). Geocode complaint addresses. Report complaint count by category and date range. Flag any complaint involving physical injury (human electric shock, animal death) — these are highest-priority and require same-day response under most utility safety policies and CPUC/PUC guidelines.
2Run spatial cluster analysis on complaint locations
Run DBSCAN spatial clustering on the geocoded complaint points with parameters: epsilon = 200 meters (the approximate reach of a single neutral fault), minimum_samples = 3 (at least 3 complaints to constitute a reportable cluster). Classify each complaint as: cluster member (part of a statistically significant spatial cluster), noise (isolated complaint, no nearby complaints). For each identified cluster, compute: centroid, number of complaints, date range of complaints, and the most-recent complaint date. Join complaint clusters to the distribution circuit network — identify which circuit feeder is within 200 meters of each cluster centroid. A single circuit with 3 or more spatial complaint clusters warrants a circuit-wide neutral impedance assessment.
3Correlate clusters with NEV measurement history
If neutral-to-earth voltage (NEV) measurement records are available, join them spatially to the cluster centroids. A NEV value above 1.0 Vrms is the IEEE Std 80 threshold for public touch potential concern (though cattle can be affected at values as low as 0.5 Vrms). Flag clusters where associated NEV measurements exceeded 1.0 Vrms at any time in the past 24 months. For clusters with no measurement history, compute a risk score: (complaint_count × recency_weight × circuit_age) where recency_weight = 2.0 if any complaint is within 90 days, 1.0 otherwise; circuit_age = 2.0 if the feeder is > 30 years old, 1.0 otherwise. Rank all clusters by risk score for prioritized field investigation.
4QA cluster analysis and assemble citations
Report the count of identified spatial clusters, the count of high-priority clusters (any complaint involving injury or NEV > 1.0 V), and the count of circuits with 3 or more associated clusters. Flag any cluster where complaints span more than 3 years without a recorded field investigation or resolution — this indicates a persistent source that has not been identified and eliminated, and represents an elevated liability risk. Note: the IEEE Std 80 and NESC (National Electrical Safety Code) establish the regulatory standards for touch potential; if any cluster is in a school zone, playground, or public water feature area, apply the more conservative 25 Vrms touch potential limit for limited-contact exposure scenarios, which requires NEV < 0.8 Vrms to maintain compliance. Assemble citation block: complaint data upload date and source CRM, circuit GIS vintage, NEV measurement data source and date range, IEEE Std 80 edition cited.
More in the Utilities pack
- Vegetation encroachment riskPrioritize trim spend by predicted outage cost.4 steps
- Hydraulic pressure deficiencyFind every node below 20 psi in your water network.3 steps
- Storm outage post-mortemGenerate the regulator-facing post-mortem in one hour.5 steps
- Smart-meter rollout planningSequence your AMI rollout for max early ROI.5 steps
- EV-charger demand forecastForecast every neighborhood's 2030 EV-charger demand.5 steps
- Distribution transformer load riskFind which transformers saturate first as EV adoption grows.5 steps