Ready-made workflow in the Utilities pack
SAIDI/SAIFI Circuit Performance Ranking
Show your PUC which feeders drag down system reliability — by the numbers they care about.
Included in the Utilities pack
$99 /seat/moJoin the waitlistThe pack includes 14 other ready-made workflows.
What it does
Uploads OMS outage event data, joins to the feeder network, computes SAIDI and SAIFI per circuit, and produces a regulator-ready report format — in an hour, not the quarterly data-pull cycle your reliability team runs manually.
- Data it uses
- Utility OMS outage event records (tabular upload)
- Electric distribution feeder and circuit network GIS
- Customer count by circuit segment
- Specialists on it
- Infrastructure Engineer, GIS Analyst, Data Engineer
The steps
Each step runs in order and shows its work as it goes. Open a step to read exactly what it asks for.
1Validate OMS data and circuit network completeness
Upload and validate the OMS outage event file — confirm required columns: circuit ID, outage start timestamp, outage restore timestamp, customers interrupted (CI), and outage cause category (at minimum: equipment failure, weather, vegetation, third-party, unknown). Report the date range covered and flag if the period is less than 12 months — SAIDI/SAIFI calculated on less than 12 months of data is not comparable to IEEE 1366 annual benchmarks. Flag records with null CI values or where restore timestamp precedes start timestamp — these will be excluded. Flag if a single event exceeds {{major_event_threshold:10000}} customers interrupted — this may qualify as a Major Event Day (MED) under IEEE 1366 and should be optionally excluded from the normalized SAIDI/SAIFI calculation (MED exclusion is standard in IEEE 1366 reporting).2Compute SAIDI and SAIFI per circuit
Join OMS outage events to the distribution circuit GIS using the circuit identifier. For each outage event, compute customer-minutes interrupted (CMI) = customers_interrupted × outage_duration_minutes. Compute per-circuit SAIDI: sum(CMI) / total_customers_on_circuit. Compute per-circuit SAIFI: count(outage events) × average(customers_interrupted_per_event) / total_customers_on_circuit. Compute CAIDI (Customer Average Interruption Duration Index) = SAIDI / SAIFI — this measures average restoration time per interruption. Rank circuits by SAIDI descending. Compute the portfolio-level SAIDI and SAIFI. Benchmark against IEEE 1366 industry medians: U.S. distribution SAIDI median is approximately 120–150 customer-minutes/year; SAIFI median is approximately 1.0–1.3 interruptions/year. Flag circuits with SAIDI more than 2× the portfolio median.
3Classify outage cause and identify high-vegetation circuits
For each circuit, compute SAIDI contribution by outage cause category (equipment failure, weather, vegetation contact, third-party, unknown). Identify circuits where vegetation is the dominant cause (> 40% of SAIDI) — these are priority candidates for enhanced trimming cycles. Identify circuits where equipment failure is the dominant cause (> 50% of SAIDI) — these are candidates for asset replacement or targeted hardening. Compute the Pareto distribution: identify the circuits that contribute 80% of total system SAIDI — in most utilities, 15–20% of circuits account for 80% of outage minutes. These worst-performing circuits are the reliability improvement priority regardless of cause.
4QA SAIDI/SAIFI outputs and assemble citations
Report system SAIDI, system SAIFI, and system CAIDI for the analysis period. Flag if system SAIDI exceeds 200 minutes — this is above the IEEE 1366 75th percentile and will likely draw PUC attention. Report the number of circuits in the top 20% by SAIDI and their aggregate contribution to system SAIDI. Flag any circuit with CAIDI above 240 minutes (4 hours average restoration time) — this may indicate a systematic restoration capability issue on that circuit rather than a frequency problem. Report the percentage of outage events with unknown cause — unknown cause above 15% of events limits the actionability of the cause analysis and should be flagged as a data quality improvement item for the OMS team. Assemble citation block: OMS data upload date and date range, circuit GIS vintage, IEEE 1366 edition used for benchmarks.
More in the Utilities pack
- Vegetation encroachment riskPrioritize trim spend by predicted outage cost.4 steps
- Hydraulic pressure deficiencyFind every node below 20 psi in your water network.3 steps
- Storm outage post-mortemGenerate the regulator-facing post-mortem in one hour.5 steps
- Smart-meter rollout planningSequence your AMI rollout for max early ROI.5 steps
- EV-charger demand forecastForecast every neighborhood's 2030 EV-charger demand.5 steps
- Distribution transformer load riskFind which transformers saturate first as EV adoption grows.5 steps