Ready-made workflow in the Utilities pack
Field Crew Work Order Geographic Clustering
Cut crew drive time 30% by clustering daily work orders before dispatch.
Included in the Utilities pack
$99 /seat/moJoin the waitlistThe pack includes 14 other ready-made workflows.
What it does
Imports the daily work order queue, geocodes all locations, clusters by drive-time proximity, assigns clusters to depots, and builds optimized daily routes per crew — replacing the morning dispatcher's manual assignment with a provably optimal schedule.
- Data it uses
- Daily work order queue (tabular upload from OMS/WMS)
- Road network (TIGER/Line + HERE)
- Crew depot locations
- Specialists on it
- Infrastructure Engineer, Transportation Engineer, GIS Analyst
The steps
Each step runs in order and shows its work as it goes. Open a step to read exactly what it asks for.
1Validate work order queue and geocode locations
Upload and validate today's work order queue — confirm required fields: work order ID, service address, work type (meter read, service connect/disconnect, equipment inspection, trouble order, planned maintenance), estimated work duration (minutes), and required crew qualification (if any). Geocode all addresses using the service territory address database. Report geocode success rate — flag if below 92%; ungeocoded work orders will be excluded from routing and must be assigned manually. Report work order count by type and total estimated work duration. Flag if total work duration exceeds {{available_crew_hours}} × number of crews — the queue has more work than available capacity today; recommend escalating to the dispatch supervisor for overtime or deferral decisions.2Cluster work orders by proximity and crew qualification
Cluster geocoded work orders using a spatially-constrained clustering approach: maximize within-cluster compactness (minimize travel between work orders in the same cluster) while respecting crew qualification constraints (trouble orders requiring qualified linemen cannot be in the same cluster as meter reads if only meter-reader crews are assigned to that cluster). Target cluster sizes of {{avg_work_orders_per_crew:10–14}} work orders based on {{daily_hours:10}}-hour shift and estimated work durations. Compute within-cluster travel time for each cluster. Flag clusters where total work duration plus estimated travel time exceeds the 10-hour shift — these clusters are too large and should be split.3Assign clusters to depots and solve crew routes
Assign each cluster to the nearest crew depot, subject to crew availability at each depot. Solve a vehicle route for each cluster: start at depot, visit all work orders in the cluster in TSP-optimal order, return to depot. Compute: total route miles per crew, estimated departure time for each stop (based on estimated work duration and drive time), estimated end-of-shift time. Flag any route where estimated end-of-shift time exceeds the {{shift_end_time:18:00}} cutoff — the dispatcher needs to either split the route or authorize overtime. Output a dispatch manifest for each crew: ordered stop list with estimated arrival time, work order details, and route map.4QA dispatch plan and assemble citations
Report total work orders assigned vs. total in the queue. Report total planned fleet miles across all crews and compare to the baseline (unoptimized star-routing estimate where each crew drives independently from depot to each work order). Quantify the mileage reduction percentage — a well-optimized routing should reduce total fleet miles by 25–40% vs. star routing. Flag any work orders not assigned (due to geocode failure, capacity overflow, or qualification mismatch) — these must be addressed by the dispatcher. Flag any crew route that returns to the depot more than once during the shift (other than a required return for equipment reload) — multiple depot returns indicate the route could be restructured for efficiency. Assemble citation block: work order data upload date, road network source and vintage, depot location data source.
More in the Utilities pack
- Vegetation encroachment riskPrioritize trim spend by predicted outage cost.4 steps
- Hydraulic pressure deficiencyFind every node below 20 psi in your water network.3 steps
- Storm outage post-mortemGenerate the regulator-facing post-mortem in one hour.5 steps
- Smart-meter rollout planningSequence your AMI rollout for max early ROI.5 steps
- EV-charger demand forecastForecast every neighborhood's 2030 EV-charger demand.5 steps
- Distribution transformer load riskFind which transformers saturate first as EV adoption grows.5 steps