EV Charging Load Impact by Feeder
Show which feeders saturate first as EV adoption ramps — by submarket and year.
Included in the Utilities pack
$99 /seat/moJoin the waitlistThe pack includes 14 other ready-made workflows.
What it does
Fetches EV registration density by census block, joins to feeder service areas, applies charging load profiles, and projects feeder peak load for 2027/2030/2035 — the distribution system impact assessment that enables you to get ahead of charging infrastructure build-out with the PUC.
- Data it uses
- State DMV EV registration data or DOE AFDC EV deployment map
- Census ACS housing type by census block
- Distribution feeder service area and peak load data
- EV charging time-of-day load profiles (DOE EPRI research)
- Specialists on it
- Infrastructure Engineer, Urban Planner, GIS Analyst, Data Engineer
The steps
Each step runs in order and shows its work as it goes. Open a step to read exactly what it asks for.
1Validate EV registration data and feeder service areas
Discover EV registration data endpoints for {{state}} — state DMV data or DOE Alternative Fuels Data Center (AFDC) EV deployment estimates. Confirm the data provides EV counts at the ZIP code or census tract level. Upload or confirm the feeder service area GIS. Report current EV count per feeder service area and compute EV penetration rate (EVs / total registered vehicles in service area). Flag service areas where current EV penetration exceeds 8% — these areas are likely to experience material load impact within the 3-year capital planning horizon and require near-term feeder assessment.2Model EV adoption growth by service area to 2035
Apply EV adoption growth curves by service area using: (1) baseline scenario (DOE Annual Energy Outlook moderate EV adoption — approximately 10% of new vehicle sales by 2027, 30% by 2030, 50% by 2035); (2) high scenario (state mandate compliance if applicable — e.g., California CARB ACF rule: 35% ZEV by 2026, 68% by 2030, 100% by 2035). Modulate the state-level curve by local income and housing type: high-income areas with high single-family housing (attached EV home charging possible) adopt 1.5× faster; high-density multifamily areas adopt 0.7× (public charging dependency). Project EV count per feeder service area at 2027, 2030, 2035 for both scenarios.
3Apply charging load profiles and project feeder peak demand
Apply residential EV charging load profiles from EPRI/DOE research: (1) unmanaged charging: evening peak add of 1.4 kW per EV to the feeder (concentrated 6–10 PM, 80% of home charging is Level 1/2 unmanaged); (2) managed/off-peak charging: 0.4 kW per EV average add to feeder (minimal peak impact with TOU incentives). Apply the unmanaged scenario as the conservative case. Add commercial DC fast charger load if {{dcfc_count}} public chargers are planned in the service area: each 150 kW DCFC adds 150 kW to feeder peak when in use; apply a 25% coincidence factor for multiple chargers on the same feeder. Compute projected feeder peak demand at 2027, 2030, 2035 by adding EV load increment to the baseline demand projection. Compute projected headroom (rated capacity - projected peak) at each year.4QA capacity projections and assemble citations
Report feeders projected to exceed 90% of rated capacity by 2027 (immediate capital action required), 2030 (medium-term capital planning), and 2035 (long-range capital plan). For each at-risk feeder, recommend the most cost-effective mitigation: (1) demand response / managed charging program (defer overload by 3–5 years, no capital required); (2) feeder reconductoring ($1.5–3M per mile); (3) new distribution substation transformer ($3–6M). Flag if the number of feeders at risk by 2030 under the high EV scenario exceeds 20% of total feeders — this indicates a system-wide investment need that requires a rate base filing and PUC approval, not just operational management. Report the difference between the base and high adoption scenarios at 2030 — the spread quantifies the range of uncertainty in the capital investment needed. Assemble citation block: EV registration data source and vintage, DOE AEO scenario reference, EPRI charging load profile study reference, feeder service area GIS vintage.
More in the Utilities pack
- Vegetation encroachment riskPrioritize trim spend by predicted outage cost.4 steps
- Hydraulic pressure deficiencyFind every node below 20 psi in your water network.3 steps
- Storm outage post-mortemGenerate the regulator-facing post-mortem in one hour.5 steps
- Smart-meter rollout planningSequence your AMI rollout for max early ROI.5 steps
- EV-charger demand forecastForecast every neighborhood's 2030 EV-charger demand.5 steps
- Distribution transformer load riskFind which transformers saturate first as EV adoption grows.5 steps