Tower Co-location Structural Feasibility Screen
Rank 500 towers by structural capacity for one more carrier before you knock on the door.
Included in the Telecom pack
$59 /seat/moJoin the waitlistThe pack includes 11 other ready-made workflows.
What it does
Fetches the tower inventory from FCC ASR, joins to any available structural assessment data, classifies by TIA-222 revision and loading history, and scores by likely remaining capacity — so your site acquisition team contacts the right tower owners first.
- Data it uses
- FCC Antenna Structure Registration (ASR) tower registry
- Operator structural assessment records (upload if available)
- Municipal zoning and setback GIS
- Specialists on it
- RF Network Engineer, Infrastructure Engineer, Regulatory Compliance Analyst, GIS Analyst
The steps
Each step runs in order and shows its work as it goes. Open a step to read exactly what it asks for.
1Fetch and validate FCC ASR tower inventory
Fetch FCC ASR tower registrations within {{study_area}} from the FCC ASR database. Confirm available fields: ASR registration number, latitude, longitude, overall structure height (AGL and AMSL), structure type (guyed, self-support, monopole, building/rooftop), owner name, FAA study number (if applicable), and construction date. Report total tower count. Flag structures with construction dates before 1996 — towers built before 1996 were designed to TIA-222-E or earlier revisions, which have lower wind and ice loading standards than current TIA-222-H; these towers have lower residual structural capacity and higher probability of requiring a full structural analysis before any loading change.2Score structural feasibility by tower type and vintage
If operator structural assessment data is available, join it to FCC ASR records by registration number. Classify each tower by structural capacity tier: (1) High feasibility — TIA-222-H designed towers with < 60% loading utilization per most recent structural analysis; (2) Moderate feasibility — TIA-222-G or TIA-222-H towers with unknown loading utilization (requires structural analysis quote but likely feasible); (3) Low feasibility — TIA-222-E or earlier vintage, unknown loading, or any tower with > 80% utilization per prior analysis; (4) Excluded — structures with active FAA violations, condemned status, or pending decommissioning. Compute a priority score: high feasibility towers in the target coverage area score highest; low feasibility towers in the target area score lowest. Rank by priority score.
3Apply zoning and setback filters
Fetch the municipal zoning GIS for the study area. For each candidate tower, determine the zoning district. Apply setback pre-screening: most municipalities require wireless facilities to be set back from residential property lines by the tower height (fall zone requirement). Compute the minimum setback distance for each tower: fall_zone = tower_height_ft × 1.0 (standard industry setback). Check whether the tower's property boundary extends beyond this setback from the nearest residential parcel. Flag towers in residentially-zoned parcels — co-location on these towers requires a conditional use permit in most jurisdictions, adding 6–12 months to the approval timeline. Towers in commercial or industrial zoning with no residential within the fall zone are lowest permitting risk.
4QA feasibility ranking and assemble citations
Report the count of towers by feasibility tier and by zoning risk. Report the percentage of towers in the High feasibility tier — if this is below 20%, the search area has an aged tower inventory and most co-location opportunities will require structural analysis, increasing pre-development cost. For the top-50 towers by priority score, report the owner name (from FCC ASR) to identify the top tower companies in the search area — knowing that Crown Castle, American Tower, SBA, or Tillman Infrastructure is the owner enables the site acquisition team to use master lease agreements rather than individual negotiations. Flag any tower with no owner name in ASR — this is a data quality gap that must be resolved before a co-location inquiry. Assemble citation block: FCC ASR database download date, operator structural assessment upload date, zoning GIS vintage.
More in the Telecom pack
- Tower line-of-sight clearanceLOS check between any two tower candidates in 10 seconds.4 steps
- Fiber route easement auditAudit any fiber route against the public ROW database.4 steps
- BEAD / RDOF eligibility packPre-build your BEAD application overnight.5 steps
- Cell-site setback complianceAudit every cell site against every state's setback rule.4 steps
- Coverage gap heatmapFind your coverage gaps weighted by population overnight.5 steps
- Backhaul fiber-to-tower planningTrace cheapest fiber route to every tower.5 steps