Ready-made workflow in the Telecom pack
BEAD / RDOF eligibility pack
Pre-build your BEAD application overnight.
Included in the Telecom pack
$59 /seat/moJoin the waitlistThe pack includes 11 other ready-made workflows.
What it does
Cross-reference FCC Broadband DATA + NTIA BEAD eligibility against your service plan. Output: an application-ready map pack including unserved / underserved blocks and projected reach.
- Data it uses
- FCC Broadband DATA (BDC)
- NTIA BEAD eligibility
- Census blocks
- Specialists on it
- RF Network Engineer, Regulatory Compliance Analyst, Data Engineer, GIS Analyst
The steps
Each step runs in order and shows its work as it goes. Open a step to read exactly what it asks for.
1Validate block coverage and eligibility rule version
Verify the Census blocks layer covers the proposed service footprint. Check the NTIA eligibility dataset vintage — flag if it predates the most recent FCC BDC filing window. Report block count and state coverage before proceeding.
2Inspect FCC + NTIA
Call inspect_rest_endpoint on {{bdc_url}} and {{bead_url}}.3Classify blocks
Tag each block as unserved / underserved / served.
4Project reach
Compute predicted reach from operator service plan. Output map pack.
5QA and assemble application citations
Verify block counts by eligibility tier sum to the total blocks in the footprint. Flag any blocks that received no eligibility tag. Assemble citation block: FCC BDC dataset version and filing date, NTIA BEAD eligibility layer vintage, Census TIGER block source year, and access dates for each endpoint.
More in the Telecom pack
- Tower line-of-sight clearanceLOS check between any two tower candidates in 10 seconds.4 steps
- Fiber route easement auditAudit any fiber route against the public ROW database.4 steps
- Cell-site setback complianceAudit every cell site against every state's setback rule.4 steps
- Coverage gap heatmapFind your coverage gaps weighted by population overnight.5 steps
- Backhaul fiber-to-tower planningTrace cheapest fiber route to every tower.5 steps
- Small Cell Gap-Fill Pole Candidate MappingFind every utility pole within 50m of your worst coverage gaps — ranked by ROI.4 steps