Ready-made workflow in the Telecom pack
Coverage gap heatmap
Find your coverage gaps weighted by population overnight.
Included in the Telecom pack
$59 /seat/moJoin the waitlistThe pack includes 11 other ready-made workflows.
What it does
Coverage gaps weighted by population reveal where buildout pays back fastest. This template intersects predicted coverage with Census ACS, ranks gaps by population × deficit.
- Data it uses
- Operator predicted coverage
- Census ACS
- Specialists on it
- RF Network Engineer, Data Engineer, GIS Analyst
The steps
Each step runs in order and shows its work as it goes. Open a step to read exactly what it asks for.
1Validate coverage layer and ACS endpoint
Verify the operator coverage polygon layer is valid and its extent covers the full service territory boundary. Check the ACS endpoint is reachable before proceeding. Report coverage layer area as a percentage of territory area — flag if less than 50% to catch obvious layer mismatches.
2Inspect ACS
Call inspect_rest_endpoint on {{acs_url}}.3Subtract coverage
Erase coverage polygons from territory boundary. Intersect remainder with ACS.
4Rank gaps
Aggregate population per gap polygon. Rank descending.
5QA results and assemble citations
Verify gap polygon count is > 0 — if 0, check the erase operation did not consume the full territory. Report total uncovered population and top-5 gap polygons by population. Assemble citation block: operator coverage dataset name and vintage, Census ACS survey year and table ID, and access date.
More in the Telecom pack
- Tower line-of-sight clearanceLOS check between any two tower candidates in 10 seconds.4 steps
- Fiber route easement auditAudit any fiber route against the public ROW database.4 steps
- BEAD / RDOF eligibility packPre-build your BEAD application overnight.5 steps
- Cell-site setback complianceAudit every cell site against every state's setback rule.4 steps
- Backhaul fiber-to-tower planningTrace cheapest fiber route to every tower.5 steps
- Small Cell Gap-Fill Pole Candidate MappingFind every utility pole within 50m of your worst coverage gaps — ranked by ROI.4 steps