Ready-made workflow in the Telecom pack
Backhaul fiber-to-tower planning
Trace cheapest fiber route to every tower.
Included in the Telecom pack
$59 /seat/moJoin the waitlistThe pack includes 11 other ready-made workflows.
What it does
Existing fiber + tower locations + ROW availability drive a least-cost path solver. Output: a ranked plan of fiber-to-tower routes for the next capex cycle.
- Data it uses
- Operator fiber routes
- Tower inventory
- Public ROW
- Specialists on it
- RF Network Engineer, Infrastructure Engineer, GIS Analyst, Data Engineer
The steps
Each step runs in order and shows its work as it goes. Open a step to read exactly what it asks for.
1Validate fiber and tower inventory
Verify the fiber route layer and tower inventory have valid geometry and share a common coordinate system. Confirm the ROW layer overlaps the study extent. Report fiber route total length, tower count, and ROW polygon count before building the cost surface.
2Build cost surface
Build cost surface from ROW + terrain. Lower cost where existing ROW; higher where private parcels.
3Least-cost path
Compute least-cost path from each tower to nearest fiber endpoint.
4Rank cycle
Sort tower-paths by estimated build cost ascending.
5QA plan and assemble citations
Verify every tower in the input received a path result — flag any orphaned towers with no feasible route. Report total estimated build length and cost range across all paths. Assemble citation block: fiber route data source and vintage, ROW registry source, terrain DEM source and resolution.
More in the Telecom pack
- Tower line-of-sight clearanceLOS check between any two tower candidates in 10 seconds.4 steps
- Fiber route easement auditAudit any fiber route against the public ROW database.4 steps
- BEAD / RDOF eligibility packPre-build your BEAD application overnight.5 steps
- Cell-site setback complianceAudit every cell site against every state's setback rule.4 steps
- Coverage gap heatmapFind your coverage gaps weighted by population overnight.5 steps
- Small Cell Gap-Fill Pole Candidate MappingFind every utility pole within 50m of your worst coverage gaps — ranked by ROI.4 steps