Ready-made workflow in the Telecom pack
Microwave Backhaul LOS Path Finder
Find viable line-of-sight backhaul paths between tower pairs before site acquisition.
Included in the Telecom pack
$59 /seat/moJoin the waitlistThe pack includes 11 other ready-made workflows.
What it does
Loads candidate tower pairs, extracts terrain profiles from USGS 3DEP, computes Fresnel zone clearance at operating frequency, checks FCC ULS for conflicting licenses, and ranks viable paths by clearance margin — replacing the week of manual path analysis with instant results.
- Data it uses
- USGS 3DEP 1-meter digital elevation model
- FCC Universal Licensing System (ULS) microwave license database
- Existing tower inventory (upload or FCC ASR)
- Specialists on it
- RF Network Engineer, Infrastructure Engineer, GIS Analyst
The steps
Each step runs in order and shows its work as it goes. Open a step to read exactly what it asks for.
1Validate tower locations and frequency parameters
Validate the candidate tower pair file — confirm required fields: site name, latitude, longitude, tower height AGL (above ground level), and intended operating frequency band. Valid point-to-point microwave bands include 6 GHz, 11 GHz, 18 GHz, 23 GHz, and E-band (71–86 GHz); flag any frequency outside these ranges as non-standard. For each tower location, snap to the USGS 3DEP DEM grid and report the terrain elevation (AMSL) at each site. Compute the straight-line path distance between each tower pair and report it — paths longer than 50 km at 11 GHz or 15 km at 23 GHz are generally inadvisable due to atmospheric fading margin requirements and should be flagged.
2Extract terrain profiles and compute Fresnel zone clearance
Extract the terrain profile along the great-circle path between each tower pair from the 3DEP DEM at 30-meter sample spacing. For each path, compute the 1st Fresnel zone radius at each terrain sample point: F1 = 17.3 × sqrt(d1 × d2 / (f × d)) where d1 and d2 are distances from each endpoint in km, f is frequency in GHz, and d is total path length in km. Compute the clearance at each terrain point: clearance = (tower1_AMSL + pro_rated_height) - (terrain_AMSL + F1_radius). A path is line-of-sight viable if minimum clearance ≥ 0 (no obstruction) AND minimum Fresnel clearance ≥ 0.6 × F1 (60% Fresnel zone clearance is the minimum for adequate signal quality under ITU-R P.526 standards). Paths with 60–100% Fresnel clearance are viable; paths with > 100% F1 clearance are excellent. Flag any path with negative clearance — physical obstruction, path is not viable.
3Check FCC ULS for frequency coordination conflicts
Fetch FCC ULS license data for all microwave licenses within 3 degrees azimuth of each candidate path and within the target frequency band. For each licensed transmitter within the coordination area, compute the angular separation from the candidate path. FCC microwave coordination requires checking for co-channel and adjacent-channel interference from any licensed station within ±1.5 degrees of the path azimuth at distances up to 320 km for licensed common carrier paths. Report the count of licensed stations requiring coordination for each candidate path. Flag any path where 3 or more existing licenses are within the coordination area at the same frequency band — these paths will require formal frequency coordination under FCC Part 101 rules and may require frequency changes or additional interference analysis.
4QA path viability and assemble citations
Report the viability classification for each candidate path: (1) Excellent (> 100% F1 clearance, no ULS conflicts), (2) Viable (60–100% F1 clearance, manageable ULS conflicts), (3) Marginal (< 60% F1 clearance but no physical obstruction — may require tower height increase or antenna beamwidth adjustment), (4) Not viable (physical obstruction on path). Report the recommended minimum antenna AGL increase for marginal paths to achieve 60% Fresnel clearance. Flag paths where the required tower height increase exceeds 20 feet — adding height to an existing tower triggers an FAA study requirement under FCC rules (FCC Form 854) and may require a new NEPA review, adding 90–180 days to the permitting timeline. Assemble citation block: USGS 3DEP DEM resolution and collection date, FCC ULS database download date, ITU-R P.526 Fresnel zone methodology.
More in the Telecom pack
- Tower line-of-sight clearanceLOS check between any two tower candidates in 10 seconds.4 steps
- Fiber route easement auditAudit any fiber route against the public ROW database.4 steps
- BEAD / RDOF eligibility packPre-build your BEAD application overnight.5 steps
- Cell-site setback complianceAudit every cell site against every state's setback rule.4 steps
- Coverage gap heatmapFind your coverage gaps weighted by population overnight.5 steps
- Backhaul fiber-to-tower planningTrace cheapest fiber route to every tower.5 steps