Ready-made workflow in the Oil & Gas pack
Wind farm wake-loss analysis
Spot wake-loss before your AEP forecast does.
Included in the Oil & Gas pack
$99 /seat/moJoin the waitlistThe pack includes 15 other ready-made workflows.
What it does
Wake-loss eats annual energy production. This template takes a turbine layout + a wind-rose climatology and computes downwind shadow areas at multiple wind directions. Output: a per-turbine wake-loss percentage and a layout sensitivity map for repowering decisions.
- Data it uses
- NREL Wind Toolkit
- Operator turbine inventory
- NOAA wind climatology
- Specialists on it
- Remote Sensing Specialist, GIS Analyst
The steps
Each step runs in order and shows its work as it goes. Open a step to read exactly what it asks for.
1Validate turbine layer and rotor diameter
Verify {{turbines}} exists with point geometry and a hub-height or turbine-model field. Report turbine count and array extent. Confirm {{rotor_diameter_m}} is between 50 and 220 m — values outside this range suggest a unit conversion error. A rotor diameter entered in feet instead of meters is the most common parameter error for this template.2Inspect wind climatology
Call inspect_rest_endpoint on {{wind_climatology_url}}.3Build directional buffers
For each 22.5° wind sector, buffer turbines 8 × {{rotor_diameter_m}} m downwind.4Compute overlap per turbine
Spatial join wake buffers to downwind turbines weighted by sector frequency. Output wake_loss_pct per turbine.
5QA wake-loss distribution and assemble citations
Report mean and maximum wake_loss_pct. Flag turbines with wake_loss_pct > 25% — these are outliers requiring manual review of wind-rose sector weights. Assemble citation block: NREL Wind Toolkit climatology grid resolution and vintage, NOAA wind climatology data product name, and source URL.
More in the Oil & Gas pack
- Pipeline ROW encroachment auditFind every encroachment on your 2,000-mile ROW overnight.4 steps
- Lease parcel due-diligence packGenerate the full title package for any lease in 60 seconds.4 steps
- Tank battery setback complianceAudit tank batteries against every state's setback rule.4 steps
- Methane plume hotspot mappingTriangulate methane leaks from satellite — daily.5 steps
- Solar farm siting suitabilityRank 10,000 parcels by solar buildability.6 steps
- Transmission corridor NEPA screenNEPA-ready scoping for any 200-mile corridor.5 steps