Ready-made workflow in the Oil & Gas pack
Methane plume hotspot mapping
Triangulate methane leaks from satellite — daily.
Included in the Oil & Gas pack
$99 /seat/moJoin the waitlistThe pack includes 15 other ready-made workflows.
What it does
TROPOMI Sentinel-5P publishes daily methane column-density rasters. This template intersects the highest-anomaly cells with your operated facilities, ranks by anomaly intensity × proximity, and produces a leak-survey priority list. Closes the loop between satellite detection and ground-crew dispatch.
- Data it uses
- TROPOMI Sentinel-5P CH4
- ESA Copernicus
- Operator facility inventory
- Specialists on it
- Remote Sensing Specialist, Field Biologist, GIS Analyst
The steps
Each step runs in order and shows its work as it goes. Open a step to read exactly what it asks for.
1Validate facility inventory and AOI
Verify {{facilities_layer}} exists with a facility-type and throughput field. Report count and geographic extent. If {{aoi}} is provided, clip the facility layer to the AOI and report how many facilities remain — a zero-facility result after AOI clip means the AOI does not overlap the facility inventory.2Inspect TROPOMI
Call inspect_rest_endpoint on {{tropomi_url}}; cache CH4 band metadata.3Sample CH4 at facilities
Extract Values to Points: TROPOMI CH4 at each facility centroid. Bucket by quartile.
4Rank survey priority
Calculate PRIORITY = CH4_anomaly_zscore * facility_throughput_norm. Export top 5%.
5QA priority list and assemble citations
Report top-10 priority facilities by PRIORITY score. Flag any facility where CH4 z-score > 3.0 — this warrants immediate ground dispatch, not just queue placement. Report scene acquisition date — TROPOMI data older than 14 days should be noted as stale for active-leak prioritization. Assemble citation block: ESA TROPOMI Sentinel-5P product ID (L2__CH4___), acquisition date, processing version, and source URL.
More in the Oil & Gas pack
- Pipeline ROW encroachment auditFind every encroachment on your 2,000-mile ROW overnight.4 steps
- Lease parcel due-diligence packGenerate the full title package for any lease in 60 seconds.4 steps
- Tank battery setback complianceAudit tank batteries against every state's setback rule.4 steps
- Wind farm wake-loss analysisSpot wake-loss before your AEP forecast does.5 steps
- Solar farm siting suitabilityRank 10,000 parcels by solar buildability.6 steps
- Transmission corridor NEPA screenNEPA-ready scoping for any 200-mile corridor.5 steps