Ready-made workflow in the Oil & Gas pack
Tank battery setback compliance
Audit tank batteries against every state's setback rule.
Included in the Oil & Gas pack
$99 /seat/moJoin the waitlistThe pack includes 15 other ready-made workflows.
What it does
Each state defines tank-battery setbacks differently. This template runs the operator's tank-battery layer against a curated state-rule table and flags any battery whose nearest school / occupied dwelling / well / surface water violates the active rule for its state. Output: a violation queue prioritized by largest aggregate liquid storage.
- Data it uses
- Operator tank battery layer
- State setback rules (curated)
- Microsoft Building Footprints
- USDA NHD
- Specialists on it
- Field Biologist, Data Engineer, GIS Analyst
The steps
Each step runs in order and shows its work as it goes. Open a step to read exactly what it asks for.
1Lookup state setback rule
For every battery in {{batteries_layer}}, look up the active setback rule from the curated state-rule table by {{state_field}}.2Near analysis: buildings
Near analysis from batteries to {{buildings_layer}}. Flag any battery whose nearest building is inside the state setback.3Near analysis: schools + water
Near analysis from batteries to {{schools_layer}} and {{water_layer}}; flag setback violations.4Prioritized violation queue
Export violations ordered by aggregate liquid storage volume descending.
More in the Oil & Gas pack
- Pipeline ROW encroachment auditFind every encroachment on your 2,000-mile ROW overnight.4 steps
- Lease parcel due-diligence packGenerate the full title package for any lease in 60 seconds.4 steps
- Methane plume hotspot mappingTriangulate methane leaks from satellite — daily.5 steps
- Wind farm wake-loss analysisSpot wake-loss before your AEP forecast does.5 steps
- Solar farm siting suitabilityRank 10,000 parcels by solar buildability.6 steps
- Transmission corridor NEPA screenNEPA-ready scoping for any 200-mile corridor.5 steps