Ready-made workflow in the Oil & Gas pack
Transmission corridor NEPA screen
NEPA-ready scoping for any 200-mile corridor.
Included in the Oil & Gas pack
$99 /seat/moJoin the waitlistThe pack includes 15 other ready-made workflows.
What it does
Transmission projects trigger NEPA. This template takes a corridor centerline, buffers per agency rules, overlays critical habitat, wetlands, tribal lands, and protected areas, and outputs a NEPA-ready scoping document with citations to every layer.
- Data it uses
- USFWS Critical Habitat
- USDA NWI wetlands
- BIA tribal lands
- PAD-US
- Specialists on it
- Field Biologist, Hydrologist, GIS Analyst
The steps
Each step runs in order and shows its work as it goes. Open a step to read exactly what it asks for.
1Validate corridor geometry and NEPA buffer parameter
Verify {{corridor}} is a line geometry layer with a project-name or segment-ID field. Report total corridor length and state list. Confirm {{buffer_m}} is between 300 and 5000 m — values below 300 m are sub-standard for NEPA corridors; values above 5000 m will produce very large study areas that may time out. Flag any self-intersecting or null segments in the centerline.2Inspect agency layers
Call inspect_rest_endpoint on {{habitat_url}}, {{wetlands_url}}, and {{padus_url}}.3Buffer corridor
Buffer {{corridor}} by {{buffer_m}} m.4Intersect all sensitive layers
Intersect corridor buffer with habitat + wetlands + PAD-US. Tag each feature with citation.
5QA sensitive-feature coverage and assemble citations
Report total corridor length and the percentage falling within each sensitive-feature category (critical habitat, wetlands, protected areas). Flag segments where > 50% of the buffer is covered by critical habitat — these require ESA Section 7 consultation independent of the NEPA process. Assemble citation block: USFWS critical habitat layer effective date and species list, USDA NWI vintage, PAD-US version, BIA tribal lands layer, and all source URLs — this citation block is required content for the NEPA scoping document.
More in the Oil & Gas pack
- Pipeline ROW encroachment auditFind every encroachment on your 2,000-mile ROW overnight.4 steps
- Lease parcel due-diligence packGenerate the full title package for any lease in 60 seconds.4 steps
- Tank battery setback complianceAudit tank batteries against every state's setback rule.4 steps
- Methane plume hotspot mappingTriangulate methane leaks from satellite — daily.5 steps
- Wind farm wake-loss analysisSpot wake-loss before your AEP forecast does.5 steps
- Solar farm siting suitabilityRank 10,000 parcels by solar buildability.6 steps