Ready-made workflow in the Oil & Gas pack
Spill Response Receptor Identification
Know every downstream receptor within 30 minutes of a spill — not 30 days.
Included in the Oil & Gas pack
$99 /seat/moJoin the waitlistThe pack includes 15 other ready-made workflows.
What it does
Geocodes the incident location, traces downstream NHD flowlines, buffers lateral corridors, and identifies drinking water intakes, schools, hospitals, and regulated facilities within receptor zones — with a ranked notification sequence by estimated time-to-reach.
- Data it uses
- USGS NHD Plus High Resolution flowlines
- EPA Safe Drinking Water Information System (SDWIS)
- EPA Facility Registry Service (FRS)
- Census populated places
- Specialists on it
- O&G Production Engineer, Hydrologist, Regulatory Compliance Analyst, GIS Analyst
The steps
Each step runs in order and shows its work as it goes. Open a step to read exactly what it asks for.
1Validate incident location and NHD connectivity
Geocode the incident location at {{incident_address_or_coordinates}}. Snap the geocoded point to the nearest NHD Plus High Resolution flowline — report the stream name, NHD COMID, and distance from point to nearest flowline (flag if snap distance exceeds 200 meters, which may indicate the spill is in an isolated impoundment rather than a connected waterway; if isolated, the downstream pathway analysis does not apply and a containment-only protocol is more appropriate). Confirm NHD Plus HR is available for the incident state — flag if only NHD Medium Resolution is available, as medium-res omits intermittent and ephemeral channels that can carry spill material during precipitation events.2Trace downstream flowlines and compute travel time
Trace all downstream flowlines from the incident COMID using NHD Plus network topology. Estimate time-of-travel to each downstream reach using the NHD Plus mean velocity attribute (attribute VELOCITY in fps); where velocity is null, apply the default of 0.5 ft/s for small streams (NHD Fcode 46003/46006) and 1.5 ft/s for rivers (Fcode 46000). Generate downstream travel-time polygons at 1-hour, 4-hour, 8-hour, and 24-hour intervals — these define the response windows for notifying downstream receptors before contamination arrives. Also generate 1,000-foot lateral buffers on each side of the traced flowlines to capture overbank flooding risk.
3Identify and rank downstream receptors
Fetch drinking water surface intakes from EPA SDWIS that fall within the lateral buffer of the downstream traced network. Fetch regulated facilities from EPA FRS. Fetch schools, hospitals, and senior living facilities from TIGER/OSM within the same buffer. For each receptor, compute estimated time-of-contamination-arrival based on upstream travel-time raster. Rank receptors into three notification tiers: Tier 1 (arrival < 4 hours — immediate emergency notification required), Tier 2 (arrival 4–12 hours — urgent regulatory notification required), Tier 3 (arrival 12–48 hours — precautionary notification required). For drinking water intakes: flag any intake serving a community water system (CWS) serving > 1,000 people — these trigger mandatory notification under SDWA Section 1433.
4QA receptor list and assemble citations
Report total receptor count by tier and type (drinking water intakes, schools, hospitals, regulated facilities, populated places). Flag if any Tier-1 receptor is a community water system intake — this is an immediate life-safety notification requirement and should be called out separately at the top of the report. Report the total river miles traced downstream and the geographic extent of the analysis. Flag if the NHD trace terminates before reaching the nearest receiving water body (ocean, Great Lake, major reservoir) — an incomplete trace may miss downstream receptors. Note the applicable EPA RQ (reportable quantity) threshold for the spilled material if {{material_type}} is provided. Assemble citation block: NHD Plus HR version and download date, EPA SDWIS last refresh date, EPA FRS last refresh date, TIGER geographic vintage year.
More in the Oil & Gas pack
- Pipeline ROW encroachment auditFind every encroachment on your 2,000-mile ROW overnight.4 steps
- Lease parcel due-diligence packGenerate the full title package for any lease in 60 seconds.4 steps
- Tank battery setback complianceAudit tank batteries against every state's setback rule.4 steps
- Methane plume hotspot mappingTriangulate methane leaks from satellite — daily.5 steps
- Wind farm wake-loss analysisSpot wake-loss before your AEP forecast does.5 steps
- Solar farm siting suitabilityRank 10,000 parcels by solar buildability.6 steps