Ready-made workflow in the Oil & Gas pack
Proposed Well Drainage Interference Analysis
Before you permit that infill well, show how much it will communicate with the parent.
Included in the Oil & Gas pack
$99 /seat/moJoin the waitlistThe pack includes 15 other ready-made workflows.
What it does
Loads the proposed well location and formation target, identifies all producing wells within the likely drainage radius, computes overlap in drainage area by formation type, and scores interference probability — giving the reservoir team the depletion map they need before spud.
- Data it uses
- State oil and gas commission well permits and production records
- Operator spacing unit map (upload)
- Formation top structure maps (upload)
- Specialists on it
- O&G Production Engineer, Geoscientist, GIS Analyst
The steps
Each step runs in order and shows its work as it goes. Open a step to read exactly what it asks for.
1Validate proposed well and production database
Geocode the proposed well surface location for {{proposed_well_api_or_name}}. Confirm the formation target and expected lateral length and azimuth. Fetch the state production database for all wells within a 2-mile radius of the proposed surface location. Report the count of producing wells in the search radius by formation zone. Flag if any offset well in the target formation is within 660 feet (1/8 mile) of the proposed lateral's projected path — most state spacing regulations require a minimum offset distance and interference at < 660 feet in tight formations is virtually certain. Note the applicable state spacing rule for {{formation_target}} in {{state}}.2Compute drainage area and lateral overlap geometry
Construct the proposed lateral's projected path using surface location, lateral length, and azimuth. Buffer the proposed lateral with a drainage half-width appropriate for the formation — use {{drainage_halfwidth_ft:500}} feet as default (typical for Permian Basin targets; Appalachian conventional formations may be 200 feet; use 660 feet for Bakken-style long laterals). Construct equivalent drainage polygons for all offset wells in the target formation using their lateral path, length, azimuth, and the same drainage half-width. Compute the intersection area between the proposed well's drainage polygon and each offset well's drainage polygon. Compute the interference ratio: intersection_area / proposed_well_drainage_area — a ratio above 0.30 (30% drainage overlap) is considered significant interference that will impair the proposed well's EUR (estimated ultimate recovery).3Estimate EUR impact and economic threshold
For each offset well with interference ratio > 0.10, fetch the producing offset well's decline curve status: (1) if the parent well is < 12 months old, it is in the hyperbolic decline phase and interference will be most severe — flag as HIGH interference risk; (2) if parent well is 12–36 months old, it is in transition to exponential decline — MODERATE risk; (3) if parent well is > 36 months old, most pressure depletion has occurred — LOWER risk. Compute the aggregate parent-child interference score as a weighted sum of (interference_ratio × depletion_phase_weight) for all offset wells. Apply the industry-standard EUR reduction factor: EUR_reduction = min(0.40, aggregate_interference_score × 0.65) — this bounds the maximum EUR impairment at 40%, which is consistent with published parent-child interference studies in major U.S. tight oil plays. Compute the economic break-even oil price adjustment: at a {{oil_price:70}} base case, a 40% EUR reduction requires a ${{breakeven_threshold}} price to maintain the target IRR.4QA interference assessment and assemble citations
Report the aggregate interference score and recommended EUR reduction. Flag if EUR reduction exceeds 25% — at this level, the infill well's economic case should be reviewed at the economic threshold price, not the base case. Flag if any offset parent well shows pressure communication evidence (production decline acceleration in months after nearby well completions within 1,000 feet) — historical communication confirms formation connectivity and reduces the uncertainty in the interference estimate. Report whether the proposed well is within the operator's approved spacing unit boundary — drilling outside the unit boundary is a title and regulatory issue that must be resolved before spud, independent of the interference result. Assemble citation block: state production database vintage, spacing unit map upload date, formation top map source and vintage.
More in the Oil & Gas pack
- Pipeline ROW encroachment auditFind every encroachment on your 2,000-mile ROW overnight.4 steps
- Lease parcel due-diligence packGenerate the full title package for any lease in 60 seconds.4 steps
- Tank battery setback complianceAudit tank batteries against every state's setback rule.4 steps
- Methane plume hotspot mappingTriangulate methane leaks from satellite — daily.5 steps
- Wind farm wake-loss analysisSpot wake-loss before your AEP forecast does.5 steps
- Solar farm siting suitabilityRank 10,000 parcels by solar buildability.6 steps