Ready-made workflow in the Oil & Gas pack
Permit Expiration Calendar Map
See every permit expiring in the next 90 days — colored by renewal complexity.
Included in the Oil & Gas pack
$99 /seat/moJoin the waitlistThe pack includes 15 other ready-made workflows.
What it does
Fetches active permits from state and federal databases, filters to expiring within 90/180 days, classifies by permit type and renewal pathway complexity, and maps by expiration band with an action queue export — so no permit lapses by oversight.
- Data it uses
- State oil and gas commission permit database
- BLM AFMSS (federal permit-to-drill database)
- EPA air and water quality permits (ECHO / eRulemaking)
- Specialists on it
- Regulatory Compliance Analyst, O&G Production Engineer, GIS Analyst
The steps
Each step runs in order and shows its work as it goes. Open a step to read exactly what it asks for.
1Discover and fetch active permit databases
Discover active permit endpoints for {{states_or_operator}}. Fetch the following permit types: (1) state O&G commission permits-to-drill and completion permits; (2) BLM APDs (applications for permit to drill) on federal acreage; (3) EPA air permits (Title V and minor source); (4) state NPDES stormwater and produced water discharge permits. For each permit type, confirm available fields: permit ID, permit type, issue date, expiration date, associated well or facility, and renewing authority. Report total permit count by type. Flag any permit type where expiration date is missing for more than 20% of records — these cannot be tracked for expiration without additional data remediation.2Filter expiring permits and classify renewal complexity
Filter permits to those expiring within 90 days (critical band) and 91–180 days (advisory band). For each expiring permit, classify renewal complexity: (1) Routine — administrative renewal with no new environmental review required (most state drilling permits, NPDES general permits); (2) Moderate — renewal requires updated application, fee, and agency review but typically no public comment (Title V air permit renewals, most BLM APDs); (3) Complex — renewal triggers new environmental review, public comment period, or interagency consultation (federal APDs on tribal lands, permits near sensitive species habitat, Title V permits with significant emission changes). Assign expected renewal lead time by complexity class: Routine = 30 days; Moderate = 90 days; Complex = 180+ days. Flag any complex permit expiring within 180 days where the renewal application has not yet been submitted.
3Geocode permits and build expiration calendar map
Geocode permits using associated well surface locations, facility addresses, or lease legal descriptions. Map permits by expiration band (< 30 days = red, 31–90 days = orange, 91–180 days = yellow) and symbolize by complexity class (circle = routine, triangle = moderate, star = complex). Generate a tabular action queue sorted by: first, days-to-expiration; second, complexity class (complex first within each expiration band). For permits where renewal lead time exceeds days-to-expiration (i.e., insufficient time to complete renewal before expiration), flag them as OVERDUE-FOR-ACTION — these are the highest-priority items in the action queue regardless of expiration date.
4QA permit coverage and assemble citations
Report the total expiring permit count by band and complexity, and the count of OVERDUE-FOR-ACTION items. Flag if any OVERDUE-FOR-ACTION item is a Title V air permit — lapse of a Title V permit without a timely renewal application (the 'permit shield') exposes the operator to enforcement action; this is a material legal risk. Report the percentage of active permits with geocoded locations — permits that could not be geocoded cannot be mapped and should be reviewed manually. Verify that the permit inventory covers all operating jurisdictions (states and federal acreage) in {{operator_name}}'s portfolio — flag any state with zero permits, as this may indicate a data gap. Assemble citation block: state permit database download date by state, BLM AFMSS download date, EPA ECHO download date.
More in the Oil & Gas pack
- Pipeline ROW encroachment auditFind every encroachment on your 2,000-mile ROW overnight.4 steps
- Lease parcel due-diligence packGenerate the full title package for any lease in 60 seconds.4 steps
- Tank battery setback complianceAudit tank batteries against every state's setback rule.4 steps
- Methane plume hotspot mappingTriangulate methane leaks from satellite — daily.5 steps
- Wind farm wake-loss analysisSpot wake-loss before your AEP forecast does.5 steps
- Solar farm siting suitabilityRank 10,000 parcels by solar buildability.6 steps