Ready-made workflow in the Oil & Gas pack
Gas Gathering Compression Capacity Analysis
Find gathering system bottlenecks before they cost you shut-in time.
Included in the Oil & Gas pack
$99 /seat/moJoin the waitlistThe pack includes 15 other ready-made workflows.
What it does
Imports the gathering system network, loads current throughput vs. design capacity per segment, identifies segments operating above 80% design capacity, and models flow redistribution if a single segment fails — the analysis your midstream partner runs quarterly, now available on demand.
- Data it uses
- Operator gathering system GIS (upload)
- PHMSA gathering pipeline data
- Operator compression inventory and design capacity records
- Specialists on it
- O&G Production Engineer, Infrastructure Engineer, GIS Analyst
The steps
Each step runs in order and shows its work as it goes. Open a step to read exactly what it asks for.
1Validate gathering network topology and capacity data
Upload and validate the gathering system GIS — confirm the network has valid connectivity (no dangling segments without upstream source connections, no orphaned laterals). Report total pipeline miles, number of compressor stations, and number of gathering headers. Validate the capacity data file — confirm required fields per segment: segment ID (matching GIS), design capacity (MMcfd), and current daily throughput (MMcfd). Flag segments with current throughput exceeding design capacity (utilization > 100%) — these are already in overload and may be causing back-pressure that is impacting well production. Report the number of compression stations with efficiency data — compressors operating above 90% of their rated HP are at risk of unplanned shutdown.
2Compute segment utilization and identify bottlenecks
Join throughput and design capacity data to each gathering segment. Compute utilization rate (%) = current_throughput / design_capacity × 100. Classify segments: < 60% = adequate headroom; 60–79% = approaching capacity; 80–89% = near capacity (flag for monitoring); ≥ 90% = critical constraint (flag for immediate action). For compressor stations, compute available compression HP headroom. Identify the binding constraint: the single segment or compressor with the highest utilization that limits the system's total throughput. Compute the total well production that flows through each near-capacity or critical segment — this is the shut-in risk exposure (MMcfd and BOE/day equivalent) if that segment fails.
3Model single-contingency failure scenarios
For each segment classified as critical (≥ 90% utilization), model the N-1 contingency: remove the segment from the network and compute the alternative routing using remaining capacity. Report: (1) whether an alternative path exists; (2) the maximum throughput achievable via alternative routing; (3) the production volume (MMcfd and BOE/day) that would be stranded if no alternative path exists. Identify wells that would lose all gathering access (stranded wells) in each failure scenario — these have zero routing redundancy and represent maximum shut-in risk. Compute the aggregate shut-in risk value: stranded_production_BOE/day × {{oil_price:70}} × estimated_downtime_days; this is the economic value of adding redundant capacity or looping the critical segment.4QA capacity analysis and assemble citations
Report the overall system utilization (total current throughput / total design capacity) and the utilization of the binding constraint. Flag if the system has zero redundancy — a gathering system where the failure of any single segment would strand > 10% of total throughput is unusually fragile for a commercial system. Report the count of wells with no routing redundancy. Verify that all PHMSA-reportable gathering segments (Type R or Type C gathering under 49 CFR 192.8) are included in the analysis — if PHMSA pipeline data reveals segments not in the operator GIS, flag the discrepancy. Assemble citation block: operator gathering system GIS upload date, capacity data vintage, PHMSA gathering pipeline data download date.
More in the Oil & Gas pack
- Pipeline ROW encroachment auditFind every encroachment on your 2,000-mile ROW overnight.4 steps
- Lease parcel due-diligence packGenerate the full title package for any lease in 60 seconds.4 steps
- Tank battery setback complianceAudit tank batteries against every state's setback rule.4 steps
- Methane plume hotspot mappingTriangulate methane leaks from satellite — daily.5 steps
- Wind farm wake-loss analysisSpot wake-loss before your AEP forecast does.5 steps
- Solar farm siting suitabilityRank 10,000 parcels by solar buildability.6 steps