Environmental Survey Crew Routing Optimization
Send your field crew to every required survey point in the least possible miles.
Included in the Oil & Gas pack
$99 /seat/moJoin the waitlistThe pack includes 15 other ready-made workflows.
What it does
Geocodes all environmental obligation points, classifies by survey type and timing requirement, computes optimal crew routing using network analysis, accounts for seasonal road closures, and outputs a day-by-day crew route plan — the assignment your environmental coordinator spends a week on every spring.
- Data it uses
- Operator environmental obligation points (upload)
- Road network (TIGER/Line + operator-owned lease roads)
- Seasonal access restriction areas (upload or state GIS)
- Specialists on it
- Regulatory Compliance Analyst, Field Biologist, GIS Analyst
The steps
Each step runs in order and shows its work as it goes. Open a step to read exactly what it asks for.
1Validate survey obligation points and access constraints
Upload and validate the environmental survey obligation point file — confirm required fields: location (lat/lon or legal description), survey type (e.g., threatened/endangered species, wetlands delineation, cultural resources, archaeological, reclamation), survey timing window (earliest start date, latest completion date), required surveyor qualification, and estimated survey duration. Geocode all obligation points and report the geocode success rate — flag if below 90%. Report the total count by survey type and by timing window. Flag any obligation points with overlapping timing windows that require different surveyor qualifications (e.g., a T&E species survey and a cultural resources survey at the same location on the same day) — these may require either two crews or sequential scheduling.
2Build road network with seasonal restrictions
Build the routable network using TIGER roads plus any operator-provided lease road GIS. Apply seasonal access restrictions: load {{seasonal_restriction_layer}} or flag known spring breakup restriction areas (typically March 15 – May 31 in northern tier states, January 15 – March 31 in wet lowland areas). Mark restricted road segments as temporarily impassable for the restriction period. Compute drive time from the crew depot at {{crew_depot_location}} to each survey obligation point using the restricted network. Flag any survey obligation points that are accessible only via restricted roads and have a timing window that falls within the restriction period — these require either alternative access (ATV, helicopter, foot travel) or a timing waiver and should be escalated to the environmental coordinator.3Optimize crew routing by day and survey window
Cluster survey obligation points by timing window into daily work-sets, prioritizing surveys with the earliest deadline. For each daily work-set, solve a vehicle routing problem: minimize total route distance while respecting survey duration (crew cannot visit more points than can be completed in a {{daily_hours:10}}-hour field day), surveyor qualification constraints (only qualified surveyors can complete T&E species surveys), and timing windows. Output a day-by-day route plan with: start location, visit sequence, estimated arrival time at each point, estimated total daily mileage, and estimated field hours. Flag any day where the optimized route requires more than {{max_daily_miles:150}} miles of driving — driving time above 3 hours per day significantly reduces field productivity and may require a satellite crew staging location.4QA route plan and assemble citations
Report total obligation points covered vs. total points in the plan. Flag any obligation points not included in the optimized route plan — these are either inaccessible (seasonal restriction conflict), unresolvable timing window conflicts, or data issues. Report total planned field days, total planned driving miles, and total estimated crew cost at {{crew_day_rate:1200}} per crew-day. Benchmark against the unoptimized routing: estimate the total miles if crews drove to each point from the depot individually (star routing) vs. the optimized circuit routing — the reduction in miles is the primary efficiency metric. Flag if any high-priority T&E species surveys (those with regulatory deadlines or permit conditions) fall in the final week of the timing window — these should be scheduled in the first third of the window to allow for resurvey if the initial attempt is inconclusive. Assemble citation block: road network source and vintage, seasonal restriction source, obligation point data upload date.
More in the Oil & Gas pack
- Pipeline ROW encroachment auditFind every encroachment on your 2,000-mile ROW overnight.4 steps
- Lease parcel due-diligence packGenerate the full title package for any lease in 60 seconds.4 steps
- Tank battery setback complianceAudit tank batteries against every state's setback rule.4 steps
- Methane plume hotspot mappingTriangulate methane leaks from satellite — daily.5 steps
- Wind farm wake-loss analysisSpot wake-loss before your AEP forecast does.5 steps
- Solar farm siting suitabilityRank 10,000 parcels by solar buildability.6 steps