Ready-made workflow in the Public Sector pack
Land Use Change Impact Modeling
Model traffic, utility, and fiscal impact of every rezoning scenario before the public hearing.
Included in the Public Sector pack
$29 /seat/moJoin the waitlistThe pack includes 11 other ready-made workflows.
What it does
Classifies parcels by current and proposed zone, applies ITE trip generation by land use type, estimates utility demand and ad valorem tax revenue change, compares against infrastructure capacity headroom, and outputs a fiscal and infrastructure impact summary — the rezoning impact analysis that planning commissions require but staff rarely has time to produce.
- Data it uses
- Parcel GIS with current zoning (local GIS or upload)
- Zoning ordinance land use classification table (upload or web fetch)
- ITE Trip Generation Manual 10th Edition rates by land use code
- Utility capacity data by service district (water/sewer/electric)
- Census ACS and local assessor data for fiscal impact estimation
- Specialists on it
- Urban Planner, Transportation Engineer, GIS Analyst, Data Engineer
The steps
Each step runs in order and shows its work as it goes. Open a step to read exactly what it asks for.
1Define rezoning boundary and classify parcels by current and proposed zone
Import the rezoning request boundary polygon and the local zoning GIS layer. Identify all parcels that intersect the rezoning boundary. For each parcel, retrieve: (1) current zoning district designation; (2) proposed zoning district designation (from the rezoning application); (3) parcel area (sq ft and acres); (4) current improvement value and land value (from county assessor); (5) current use classification (from assessor land use code). Map both current and proposed zoning to standardized land use categories using the ITE Land Use Manual categories: Single Family Residential (ITE 210), Multi-family Residential (ITE 220), General Office (ITE 710), Shopping Center (ITE 820), Industrial (ITE 110), Light Industrial (ITE 140), etc. If the local zoning code's categories do not directly map to ITE codes, use the nearest ITE category by density and use type. Flag any parcel in the rezoning area with an existing long-term lease or non-conforming use — these may not be immediately developable. Report: total parcel count, total acreage, current use distribution, and proposed use distribution.
2Compute ITE trip generation for current and proposed development scenarios
Apply ITE Trip Generation Manual 10th Edition rates to estimate daily and AM/PM peak-hour trip generation for both the current and proposed land use scenarios. Use the ITE best-fit regression equation for each land use category where available; otherwise use average rates. For residential uses, independent variable = dwelling units (estimate from density standard: e.g., R-4 zone = 10 DU/acre × parcel acreage). For commercial uses, independent variable = gross floor area (estimate as 40% lot coverage × 2-story assumption × lot area for retail; 60% × 5-story for office). Compute: (1) Current scenario baseline trip generation (if parcels are currently developed at existing use); (2) By-right build-out scenario: full development allowed under proposed zoning, standard density; (3) Conservative scenario: 75% of by-right build-out. For each scenario: daily trips, AM peak-hour in/out, PM peak-hour in/out. Compute net new trips: proposed minus current. Report trip generation table by ITE land use code and scenario.
3Estimate utility demand increment and capacity headroom
Estimate utility demand increment for the proposed development: (1) Water: residential = 75 gpd/person × 2.5 persons/dwelling unit; office = 0.10 gpd/sq ft; retail = 0.05 gpd/sq ft; industrial = variable, use 0.25 gpd/sq ft default. (2) Sewer: assume 80% of water demand generates sewer flow. (3) Electric: residential = 1.2 kW peak/DU; office = 5 W/sq ft peak; retail = 8 W/sq ft peak. Compare incremental demand to the utility service capacity available in the project area: fetch utility service area capacity data from the utility provider's GIS or annual report (search for '[utility name] annual report infrastructure capacity'). If the incremental demand exceeds 50% of available capacity, flag as 'Utility Capacity Constraint — requires utility capacity study prior to final plat'. If it exceeds 100%, flag as 'Utility Extension Required — developer contribution likely required'. Report: demand by utility type, available capacity, utilization percentage, and constraint flags.
4Compute fiscal impact and generate planning commission report
Compute ad valorem tax revenue change: (1) Estimate assessed value of the proposed development at build-out using the income capitalization approach for commercial or the comparable-sales approach for residential: for residential, use the median assessed value per dwelling unit for the proposed zone type from the county assessor's records × number of estimated DUs; for commercial, use assessed value/sq ft for the proposed ITE land use type from the assessor's commercial property file × estimated gross floor area. (2) Apply local millage rate to assessed value to compute annual property tax revenue. (3) Compute net fiscal impact: new annual tax revenue − estimated new public service cost increment. Service cost benchmarks: residential adds $1,800–$3,200/DU/year in service costs (school, parks, police, fire); commercial adds $0.50–$1.50/sq ft/year. Flag scenarios where service costs exceed new tax revenue as 'Fiscally Negative — cost to existing taxpayers'. Produce the planning commission impact report: (1) by-right build-out summary; (2) ITE trip generation table; (3) utility demand and capacity check; (4) fiscal impact (annual revenue, annual cost, net). (5) Staff recommendation: note all constraint flags (utility capacity, traffic, fiscal) with mitigation options. Assemble citation block: ITE Trip Generation Manual 10th Ed., local zoning ordinance effective date, county assessor data vintage, utility capacity source and date.
More in the Public Sector pack
- NEPA scoping pack generationGenerate a NEPA scoping doc for any project corridor.5 steps
- ADA sidewalk compliance auditDetect non-compliant sidewalk segments from streetview.4 steps
- Title-VI environmental-justice analysisPre-empt every EJ challenge with the agency-required map pack.4 steps
- FOIA-ready parcel packAssemble parcel + ownership + zoning packs in 5 minutes.4 steps
- ARPA-funded equity auditAudit ARPA spending against community demographics.4 steps
- Capital Improvement Program Priority RankingRank every deferred maintenance item by failure consequence × cost × asset age.4 steps