Ready-made workflow in the Public Sector pack
Capital Improvement Program Priority Ranking
Rank every deferred maintenance item by failure consequence × cost × asset age.
Included in the Public Sector pack
$29 /seat/moJoin the waitlistThe pack includes 11 other ready-made workflows.
What it does
Imports the asset inventory with condition scores, applies an age-condition-criticality scoring matrix weighted by customers served, normalizes by budget year, and produces a ranked capital improvement map with a 5-year capital plan output — the analysis that turns a 300-row asset spreadsheet into a defensible budget submission.
- Data it uses
- Municipal asset inventory with condition scores (upload)
- Asset inspection records and replacement cost estimates (upload)
- Utility service area and customer connections GIS
- Census block population for failure consequence estimation
- Specialists on it
- Infrastructure Engineer, Urban Planner, Risk & Exposure Analyst, GIS Analyst
The steps
Each step runs in order and shows its work as it goes. Open a step to read exactly what it asks for.
1Validate asset inventory and assign infrastructure class
Import the asset inventory. Required fields: asset ID, asset type (water main, sanitary sewer, road, bridge, stormwater pipe, facility), material or construction type, installation year, diameter or capacity rating, current condition score (PACP for pipes: 1–5 scale; NBI for bridges: 0–9; PCI for pavement: 0–100; or agency-specific), and replacement cost estimate. For any asset missing a condition score, apply the default deterioration curve: assume condition score = 5 − (current year − installation year) / (design life years × 0.25). Standard design lives: cast-iron water main = 80 years; PVC = 50 years; concrete sewer = 60 years; asphalt pavement = 20 years; concrete bridge = 75 years. Flag assets with installation year > 5 years ago and no inspection record as 'Uninspected — apply deterioration default'. Report asset count by type, age distribution, and average condition score by asset class.
2Score assets by failure consequence and criticality
Compute failure consequence score (0–10) for each asset based on downstream impact: (1) Customers/residents served: join the asset's service zone to Census block population. Score = ln(population_served) / ln(10000) × 10, capped at 10. For linear assets (pipes, roads), use the sum of parcels directly served. (2) Critical service dependency: assets serving hospitals, schools, emergency services, or water supply receive a +2.0 consequence multiplier. Assets within a FEMA regulatory floodplain receive +1.0. Assets classified as 'redundant' (parallel line exists) receive −1.5. (3) Failure mode impact: buried water main failure = score 7 (service disruption + excavation cost); bridge failure = score 9 (potential life safety); road failure = score 5; sanitary overflow = score 8 (regulatory NOV risk). Compute composite consequence score: base consequence × service-dependency multiplier. Report by asset type and consequence tier.
3Compute capital investment priority score and 5-year phasing
Compute Priority Investment Score (PIS) per asset: PIS = (10 − condition_score) × consequence_score × (current_age / design_life). This formula: rewards assets in worst condition (high 10 − condition term), scales by impact if failed (consequence), and adjusts for how close to end-of-life the asset is (age/design-life fraction). Normalize PIS to 0–100 scale. Phase assets into 5-year bands: Year 1–2: PIS > 75 (critical, imminent failure risk); Year 2–3: PIS 50–75 (high priority); Year 3–5: PIS 25–50 (medium priority); Deferred: PIS < 25. Apply budget constraint: sum the replacement cost of Year 1–2 assets. If Year 1–2 cost exceeds 40% of total 5-year CIP budget, reschedule the lowest-consequence assets from Year 1–2 into Year 2–3 until the Year 1–2 budget is ≤ 40% of total. Report total replacement cost by year, budget utilization, and deferred liability for PIS < 25 assets.
4Generate CIP priority map and budget submission exhibits
Produce the budget submission deliverables: (1) CIP priority map: assets symbolized by PIS tier (Year 1–2 = red, Year 2–3 = orange, Year 3–5 = yellow, Deferred = green), scaled by replacement cost (proportional symbol). (2) 5-year capital plan table: asset ID, type, location, installation year, condition score, PIS, replacement cost, phased year, and consequence tier. (3) Asset class summary: total replacement cost and count by asset type and year band. (4) Deferred liability register: all PIS < 25 assets with total replacement cost — this is the unfunded liability figure for the audited financial notes. (5) Infrastructure age profile chart description: bar chart of asset count by decade of installation, grouped by asset type — useful for council or commission presentation. Assemble citation block: inspection data vintage, Census block population vintage, replacement cost estimate source and year, ASCE COWE infrastructure deterioration model reference.
More in the Public Sector pack
- NEPA scoping pack generationGenerate a NEPA scoping doc for any project corridor.5 steps
- ADA sidewalk compliance auditDetect non-compliant sidewalk segments from streetview.4 steps
- Title-VI environmental-justice analysisPre-empt every EJ challenge with the agency-required map pack.4 steps
- FOIA-ready parcel packAssemble parcel + ownership + zoning packs in 5 minutes.4 steps
- ARPA-funded equity auditAudit ARPA spending against community demographics.4 steps
- Emergency Evacuation Route OptimizationModel the fastest evacuation for every hazard scenario — find the chokepoints before an emergency.4 steps