Ready-made workflow in the Public Sector pack
ARPA-funded equity audit
Audit ARPA spending against community demographics.
Included in the Public Sector pack
$29 /seat/moJoin the waitlistThe pack includes 11 other ready-made workflows.
What it does
Cross-reference ARPA spend by census tract against demographic equity baselines.
- Data it uses
- ARPA project list
- Census ACS
- HUD median household income
- Specialists on it
- Data Engineer, GIS Analyst
The steps
Each step runs in order and shows its work as it goes. Open a step to read exactly what it asks for.
1Validate ARPA project list and geocode inputs
Verify the ARPA project list contains project_id, project address or coordinates, and dollar amount fields. Report any records missing location data that cannot be geocoded. Confirm Census ACS demographic fields are available for the jurisdiction geography.
2Geocode projects and spatial join to ACS tracts
Geocode each ARPA project to census tract. Spatial join to ACS to attach median household income, minority population percentage, and low-income population count per tract. Aggregate total ARPA spending by tract.
3Compute equity ratio and identify disparities
EQUITY_RATIO = ARPA spend per capita in tracts with income below 80% AMI ÷ ARPA spend per capita in tracts above 120% AMI. Compute ratio by project category (infrastructure, housing, economic development, etc.). Flag categories where ratio < 1.0 (disproportionately benefiting higher-income tracts). Output an equity scorecard table by program category.
4QA results and assemble citations
Report total projects geocoded, count with geocoding failures, and spending coverage rate. Summarize equity ratio by category with confidence intervals. Assemble citation block: Census ACS 5-year vintage, HUD AMI limits by MSA and year, ARPA allocation source, and access date.
More in the Public Sector pack
- NEPA scoping pack generationGenerate a NEPA scoping doc for any project corridor.5 steps
- ADA sidewalk compliance auditDetect non-compliant sidewalk segments from streetview.4 steps
- Title-VI environmental-justice analysisPre-empt every EJ challenge with the agency-required map pack.4 steps
- FOIA-ready parcel packAssemble parcel + ownership + zoning packs in 5 minutes.4 steps
- Capital Improvement Program Priority RankingRank every deferred maintenance item by failure consequence × cost × asset age.4 steps
- Emergency Evacuation Route OptimizationModel the fastest evacuation for every hazard scenario — find the chokepoints before an emergency.4 steps