Ready-made workflow in the Public Sector pack
Infrastructure Age and Criticality Index
Score every asset in your water/sewer/road network by age, condition, and failure consequence.
Included in the Public Sector pack
$29 /seat/moJoin the waitlistThe pack includes 11 other ready-made workflows.
What it does
Loads the infrastructure network with installation year and inspection scores, computes expected remaining useful life, weights by customers served, produces a criticality-weighted risk score, and outputs a color-coded risk tier GIS layer with a 10-year replacement priority table — the infrastructure risk register that state asset management plans require but never get funded to produce properly.
- Data it uses
- Water, sewer, and road network GIS with asset attributes (upload)
- Inspection condition reports (upload or city database)
- Service connection and customer count per network segment
- USEPA Clean Water and Drinking Water SRF infrastructure deficiency data
- Specialists on it
- Infrastructure Engineer, Urban Planner, GIS Analyst, Data Engineer
The steps
Each step runs in order and shows its work as it goes. Open a step to read exactly what it asks for.
1Load network and impute missing condition scores via deterioration model
Import the infrastructure network GIS. Required fields: segment ID, asset type (water main, sanitary sewer, storm sewer, road, bridge), material, installation year (or estimated decade), diameter or capacity, inspection condition score (1–5 PACP for pipes, NBI 0–9 for bridges, PASER 1–10 for pavement), and repair/replacement cost per linear foot (or per sq yd for pavement). For segments with no condition score, apply the standard deterioration model to impute a score: (1) Water main — cast iron: condition = 5 − age/20 (rated 1 at 80 years); ductile iron: 5 − age/25; PVC: 5 − age/15. (2) Sanitary sewer — concrete: condition = 5 − age/24; VCP: 5 − age/20. (3) Road — asphalt: PASER = 10 − age/3 (rated 1 at 27 years); concrete: PASER = 10 − age/5. (4) Bridge — concrete: NBI = 9 − age/8. Flag all imputed scores with a data quality warning. Report: segment count by asset type, percentage with inspected vs. imputed scores, and asset age distribution by decile.
2Compute criticality score and expected remaining useful life
Compute two metrics per segment: (1) Expected Remaining Useful Life (ERUL): ERUL (years) = design_life × (condition_score / 5) − (current_age − design_life × (1 − condition_score / 5)). Constrain to 0–design_life. Flag segments with ERUL ≤ 5 years as 'End-of-Life Imminent'. (2) Criticality score (0–10): based on service consequence. Join the segment to its downstream service area: (a) water main criticality = ln(connected services) / ln(2000) × 10 where services = residential + commercial connections served; (b) add 2.0 for segments serving a hospital, school, or fire station; (c) add 1.5 for segments classified as 'backbone' or 'transmission' (diameter ≥ 12 inches for water, ≥ 15 inches for sewer); (d) add 1.0 for segments within FEMA Zone AE (failure during flood exacerbates community impact). Compute Infrastructure Risk Index (IRI): IRI = (1 / ERUL_fraction) × criticality_score where ERUL_fraction = ERUL / design_life. High IRI = old asset with high consequence if it fails.
3Classify segments by risk tier and assign replacement decade
Normalize IRI to 0–100 scale. Classify segments into four risk tiers: Tier 1 Critical (IRI 75–100, ERUL ≤ 5 years): schedule replacement Years 1–3. Tier 2 High (IRI 50–75, ERUL 5–10 years): schedule replacement Years 3–7. Tier 3 Moderate (IRI 25–50, ERUL 10–20 years): schedule replacement Years 7–15. Tier 4 Low (IRI < 25, ERUL > 20 years): monitor. Apply budget constraint: compute total replacement cost for Tier 1 segments. If Tier 1 cost exceeds the agency's estimated 5-year capital budget capacity (input by user, default = network miles × $80K per mile average), rank Tier 1 segments by IRI descending and defer the lowest-IRI Tier 1 segments to Tier 2 until the constrained budget fits. Flag all deferred Tier 1 segments as 'Budget-Deferred Critical' — these represent residual risk that should be disclosed in the agency's infrastructure risk register per GASB 34/GASB 96 asset management guidance. Report: total replacement cost by tier, deferred liability, and constrained 5-year plan.
4Generate infrastructure risk layer and 10-year replacement plan
Produce the infrastructure risk management deliverables: (1) Risk tier map: network segments colored by tier (red = Tier 1, orange = Tier 2, yellow = Tier 3, green = Tier 4), with line width proportional to segment diameter or capacity class. (2) 10-year replacement schedule table: segment ID, asset type, location, installation year, material, condition score, IRI, risk tier, replacement year window, unit cost, and total cost. Sort by replacement year then IRI descending. (3) Asset class summaries: by asset type — total network length, average age, average condition, Tier 1–2 replacement cost, and Tier 1–2 length as percentage of total. (4) State Asset Management Plan input: compute the required USEPA DWAM or CWAM metrics — percentage of assets in Tier 1–2 (inadequate condition), total unfunded replacement liability, and 20-year capital investment requirement. These are required inputs for SRF loan applications and state infrastructure asset management plan submissions. Assemble citation block: inspection data vintage, construction record dates, deterioration model reference (AWWA M28 / WRF project 4245 for water infrastructure; ASCE bridge NBI reference), GASB 34 asset management guidance.
More in the Public Sector pack
- NEPA scoping pack generationGenerate a NEPA scoping doc for any project corridor.5 steps
- ADA sidewalk compliance auditDetect non-compliant sidewalk segments from streetview.4 steps
- Title-VI environmental-justice analysisPre-empt every EJ challenge with the agency-required map pack.4 steps
- FOIA-ready parcel packAssemble parcel + ownership + zoning packs in 5 minutes.4 steps
- ARPA-funded equity auditAudit ARPA spending against community demographics.4 steps
- Capital Improvement Program Priority RankingRank every deferred maintenance item by failure consequence × cost × asset age.4 steps