Ready-made workflow in the Mining pack
Tailings storage facility InSAR monitoring
InSAR-based displacement monitoring for every TSF.
Included in the Mining pack
$99 /seat/moJoin the waitlistThe pack includes 11 other ready-made workflows.
What it does
Sentinel-1 SAR interferometry tracks mm-scale displacement of tailings dams over time.
- Data it uses
- Sentinel-1 SAR
- TSF facility inventory
- Specialists on it
- Geoscientist, Remote Sensing Specialist, GIS Analyst
The steps
Each step runs in order and shows its work as it goes. Open a step to read exactly what it asks for.
1Inspect Sentinel-1 endpoint and verify SAR stack availability
Call inspect_rest_endpoint on the Sentinel-1 SAR imagery service. Confirm a minimum 6-image SAR stack is available for each TSF location over the monitoring period. Report orbital direction (ascending/descending), acquisition frequency, and incidence angle. Flag any TSF where < 6 scenes are available — results will have wider confidence intervals.
2InSAR displacement
Compute Sentinel-1 InSAR pairs; produce displacement time series per TSF.
3Alert on rate
Flag TSFs with displacement rate > 5 mm/yr or anomalous acceleration.
4QA monitoring results and assemble citations
Report displacement rate (mm/yr) for each TSF, confidence interval, and alert status (normal / watch / warning). Verify alert thresholds align with the operator's dam safety monitoring plan. Assemble citation block: Sentinel-1 scene acquisition dates, orbital track, InSAR processing method, displacement rate alert threshold, TSF inventory source, and analysis date.
More in the Mining pack
- Claim staking overlayVerify any claim's overlap with active and abandoned claims.4 steps
- Reclamation raster diffQuantify reclamation progress year-over-year.4 steps
- Drill-target prioritizationRank drill targets by geochem + structural fit.4 steps
- Ore-body 3D model updateUpdate the resource model with this quarter's drilling.4 steps
- Permit-boundary compliance auditVerify operations stay inside permit boundaries quarterly.4 steps
- Blast Safety Exclusion Zone MappingMSHA-compliant exclusion zones for every blast event — before the pre-blast survey.4 steps