Ready-made workflow in the Mining pack
Claim staking overlay
Verify any claim's overlap with active and abandoned claims.
Included in the Mining pack
$99 /seat/moJoin the waitlistThe pack includes 11 other ready-made workflows.
What it does
Cross-reference proposed claim boundaries with BLM LR2000 active + abandoned records.
- Data it uses
- BLM LR2000
- Proposed claim boundary
- Specialists on it
- Geoscientist, Regulatory Compliance Analyst, Data Engineer, GIS Analyst
The steps
Each step runs in order and shows its work as it goes. Open a step to read exactly what it asks for.
1Validate proposed claim geometry and jurisdiction
Verify the proposed claim boundary is a valid closed polygon with no self-intersections. Confirm the claim falls within the correct state and BLM field office jurisdiction. Report claim area in acres and the county/state. Flag geometry issues before querying LR2000.
2Inspect BLM LR2000
Call inspect_rest_endpoint on {{lr2000_url}}.3Overlay claims
Intersect proposed claim with LR2000 active + abandoned. Output overlap polygons.
4QA overlaps and assemble citations
Report count of active claim overlaps, count of abandoned claim overlaps, and overlap area as a percentage of the proposed claim. Flag any overlap > 10% for legal review. Assemble citation block: BLM LR2000 dataset vintage, case serial number format, BLM field office, and access date.
More in the Mining pack
- Tailings storage facility InSAR monitoringInSAR-based displacement monitoring for every TSF.4 steps
- Reclamation raster diffQuantify reclamation progress year-over-year.4 steps
- Drill-target prioritizationRank drill targets by geochem + structural fit.4 steps
- Ore-body 3D model updateUpdate the resource model with this quarter's drilling.4 steps
- Permit-boundary compliance auditVerify operations stay inside permit boundaries quarterly.4 steps
- Blast Safety Exclusion Zone MappingMSHA-compliant exclusion zones for every blast event — before the pre-blast survey.4 steps