Blast Safety Exclusion Zone Mapping
MSHA-compliant exclusion zones for every blast event — before the pre-blast survey.
Included in the Mining pack
$99 /seat/moJoin the waitlistThe pack includes 11 other ready-made workflows.
What it does
Computes flyrock exclusion radii from bench geometry and ground vibration radii using the ISEE scaled-distance formula, overlays both against sensitive receptors from school and hospital GIS, and generates MSHA-format exclusion zone maps in the time it takes your blasting contractor to drive to the site.
- Data it uses
- Operator blast-point inventory (upload)
- USGS 3DEP 1-meter DEM for terrain correction
- Census populated places and school/hospital locations (OSM + state GIS)
- Operator operational permit boundary
- Specialists on it
- Geoscientist, Regulatory Compliance Analyst, GIS Analyst
The steps
Each step runs in order and shows its work as it goes. Open a step to read exactly what it asks for.
1Validate blast point inventory and compute bench geometry
Import the blast-point inventory. Validate required fields: blast location (x/y or lat/lon), bench height (ft or m), hole diameter (inches), burden and spacing (ft), and ANFO equivalent (lbs). For any points missing bench height, apply the operator's site default from the operational permit. Confirm all coordinates project inside the permit boundary — flag any outlier points more than 500 m outside the permit as likely data errors requiring manual review before proceeding. Report total blast points, coordinate system used, and any validation flags.
2Compute flyrock and ground-vibration exclusion radii
For each blast point, compute two exclusion radii: (1) Flyrock: use the ISEE Blasters Handbook empirical formula — flyrock radius (ft) = 1000 × burden (ft) for quarry face shots; use 350 × burden for pit shots. Apply a 1.5× safety multiplier per MSHA compliance guidance. (2) Ground vibration: use the USBM scaled-distance formula PPV = K × (D / W^0.5)^n where K = 160, n = –1.6 (conservative site-amplification default per OSMRE RI 8507). Solve for the distance at which PPV = 2.0 in/s (OSMRE residential structure limit) and PPV = 0.5 in/s (OSMRE historical structures limit). Generate circular buffer polygons for each radius at each blast point. Where blast points are within 100 m of each other, merge overlapping buffers into a single exclusion zone polygon per blast event group.
3Identify sensitive receptors within exclusion zones
Intersect the exclusion zone polygons with: (1) residential parcels from the county assessor GIS (fetch via web search if not pre-loaded — use state open data portal or county GIS REST endpoint); (2) schools, hospitals, churches, and childcare facilities from OSM overpass API filtered to the bounding box; (3) Census populated place centroids for rural clusters. For each receptor within any exclusion zone, record: receptor type, name (if available), address, and which blast point(s) generate the enclosing zone. Count total receptors by type inside: (a) flyrock zone, (b) PPV-2.0 zone, (c) PPV-0.5 zone. Flag any schools or hospitals within the flyrock zone as requiring direct notification under MSHA Part 56/57.6901.
4Generate MSHA-format exclusion zone map and receptor notification list
Produce the output package: (1) GIS layer: exclusion zone polygons attributed with blast ID, zone type (flyrock / 2.0 in/s / 0.5 in/s), radius (ft), and blast parameters used. (2) Receptor notification list: CSV with receptor name, type, address, enclosing zone type, and distance to nearest blast point — sorted by proximity. (3) Compliance summary table per blast event: date, location, zone radii, receptor count by type, and MSHA Part 56.6900 series compliance flag (pass/fail). Assemble citation block: ISEE Blasters Handbook (current edition), USBM RI 8507 PPV model, OSMRE blasting regulations (30 CFR Part 816/817 for surface coal; MSHA Part 56 for metal/nonmetal), 3DEP DEM vintage, and county assessor vintage.
More in the Mining pack
- Claim staking overlayVerify any claim's overlap with active and abandoned claims.4 steps
- Tailings storage facility InSAR monitoringInSAR-based displacement monitoring for every TSF.4 steps
- Reclamation raster diffQuantify reclamation progress year-over-year.4 steps
- Drill-target prioritizationRank drill targets by geochem + structural fit.4 steps
- Ore-body 3D model updateUpdate the resource model with this quarter's drilling.4 steps
- Permit-boundary compliance auditVerify operations stay inside permit boundaries quarterly.4 steps