Ready-made workflow in the Mining pack
NPDES Discharge Point Compliance Audit
Verify every stormwater and process discharge point is inside its permitted boundary — quarterly.
Included in the Mining pack
$99 /seat/moJoin the waitlistThe pack includes 11 other ready-made workflows.
What it does
Geocodes all active discharge points from the operator's stormwater infrastructure GIS, intersects them with NPDES permit authorized discharge boundaries, identifies any unauthorized discharges, and computes buffer distances to the nearest water body — the quarterly compliance audit your environmental manager spends two full days conducting in the field.
- Data it uses
- NPDES permit boundaries and authorized discharge location maps (EPA ECHO portal)
- Operator stormwater and process-water infrastructure GIS (upload)
- GPS survey of actual discharge point locations (upload or web_search)
- NHDPlus HR flowlines and waterbodies
- EPA ECHO NPDES compliance data
- Specialists on it
- Regulatory Compliance Analyst, Hydrologist, GIS Analyst
The steps
Each step runs in order and shows its work as it goes. Open a step to read exactly what it asks for.
1Fetch permit boundaries and authorized discharge locations from EPA ECHO
Search EPA ECHO (Enforcement and Compliance History Online) for the operator's NPDES permit(s) by facility name or permit number. Fetch permit boundary GIS from the ECHO REST API (endpoint: https://echodata.epa.gov/echo/dfr_rest_services.get_facilities). If the permit GIS is not available via ECHO REST, fetch the permit document and extract authorized discharge locations (outlet coordinates) from the Discharge Monitoring Report (DMR) or permit schedule tables. Validate that all permit numbers are current and not administratively continued (check permit expiration date — permits more than 5 years past expiration require flagging even if operationally continued). Report: permit IDs, permit status, expiration dates, and number of authorized outfalls per permit.
2Geocode operator discharge infrastructure and validate field positions
Import the operator's stormwater and process-water infrastructure GIS. Identify all points classified as discharge structures: culvert outfalls, pipe discharge points, sedimentation pond outlets, process-water discharge weirs, and emergency overflow spillways. If GPS survey coordinates have been provided (field-verified locations), join to the infrastructure layer by structure ID. For structures without GPS verification, use the GIS-mapped location with a ±15 m uncertainty flag (typical GPS accuracy for engineering GIS without RTK). Classify each discharge point by discharge type: (1) stormwater (SWPPP-governed), (2) process water (permit Schedule B or Table 1 limits apply), (3) mine dewatering, (4) emergency overflow. Report total discharge points by type and data-quality tier (GPS-verified vs. GIS-mapped).
3Intersect discharge points with permit boundaries and identify violations
Perform point-in-polygon intersection of all discharge points against the authorized permit outfall locations. A discharge point is 'in compliance' if it is within 50 m of its authorized NPDES outfall coordinate (accounting for GPS positioning uncertainty). Flag any discharge point that is: (a) > 50 m from its nearest authorized outfall — potential unpermitted discharge; (b) not matched to any authorized outfall — unauthorized discharge requiring immediate reporting under 40 CFR 122.41(l)(3); (c) in a different watershed than its authorized outfall (determined by NHD HUC12 membership). For violations, compute: distance from authorized location, NHD stream reach receiving the discharge, and estimated travel time to nearest downstream water quality monitoring station. Apply USEPA penalty guidance: unpermitted discharges of process water carry civil penalties up to $37,500/day under CWA Section 309(d) — include this context in the violation flag.
4Compute proximity-to-water metrics and generate compliance report
For each discharge point (compliant and flagged), compute: (1) straight-line distance to the nearest NHDPlus HR flowline (perennial, intermittent, and canal/ditch); (2) distance to the nearest NHD waterbody (lake, pond, reservoir, estuary); (3) upstream catchment area (acres) contributing to the discharge point — fetch from USGS StreamStats API if available for the state, or compute from 3DEP DEM. Check EPA ECHO DMR Pollutant Loading Tool for each permitted outfall — flag any outfall with a significant non-compliance (SNC) determination in the most recent four quarters. Generate the quarterly compliance report: (a) summary table by permit ID with outfall-level compliance status; (b) map with compliant discharge points (green), monitoring-needed points (yellow), and violation candidates (red); (c) violation narrative with CWA citation and recommended corrective action. Assemble citation block: EPA ECHO data pull date, NHDPlus HR vintage, 40 CFR 122.41 compliance standard, CWA Section 309(d) penalty schedule (current year EPA inflation adjustment).
More in the Mining pack
- Claim staking overlayVerify any claim's overlap with active and abandoned claims.4 steps
- Tailings storage facility InSAR monitoringInSAR-based displacement monitoring for every TSF.4 steps
- Reclamation raster diffQuantify reclamation progress year-over-year.4 steps
- Drill-target prioritizationRank drill targets by geochem + structural fit.4 steps
- Ore-body 3D model updateUpdate the resource model with this quarter's drilling.4 steps
- Permit-boundary compliance auditVerify operations stay inside permit boundaries quarterly.4 steps