Ready-made workflow in the Mining pack
Acid Mine Drainage Downstream Pathway Analysis
Model where AMD flows if your impoundment fails — before the regulators model it for you.
Included in the Mining pack
$99 /seat/moJoin the waitlistThe pack includes 11 other ready-made workflows.
What it does
Delineates downstream watersheds from tailings impoundment breach points, traces NHD flow paths with travel-time estimates, identifies every drinking water intake and aquatic receptor in the pathway, and computes AMD loading by pH model — the analysis that turns a regulatory data request into a 30-minute deliverable instead of a 2-week engineering engagement.
- Data it uses
- Tailings storage facility (TSF) impoundment boundary (upload)
- USGS NHDPlus HR flowlines (NHD perennial and intermittent)
- USGS 3DEP DEM for watershed delineation
- EPA SDWIS drinking water intake locations
- EPA FRS regulated facility registry
- Specialists on it
- Geoscientist, Hydrologist, Field Biologist, Regulatory Compliance Analyst, GIS Analyst
The steps
Each step runs in order and shows its work as it goes. Open a step to read exactly what it asks for.
1Delineate downstream watershed from impoundment breach points
Import the TSF impoundment boundary. Identify likely breach points: (1) the lowest point of the impoundment perimeter dam crest (compute from 3DEP DEM — use arcpy.sa Fill, FlowDirection, FlowAccumulation to identify the saddle point); (2) any existing decant or emergency spillway locations if provided by the operator. For each breach point, delineate the downstream watershed using the D8 flow direction grid from 3DEP. Compute the full contributing area that would receive released effluent under a dam-failure scenario. Report breach point coordinates, breach-scenario watershed area (acres), and the stream channel the breach flow would enter within the first 500 m.
2Trace NHD downstream flow path and compute travel times
Fetch NHDPlus HR flowlines for the downstream watershed. Trace the network downstream from the breach entry point to: (a) the first major confluence with a named stream (order ≥ 4); (b) the first drinking water intake within 100 km; (c) the state border or 200 km downstream, whichever comes first. For each flowline reach, compute estimated travel time using the NHDPlus EROM mean annual velocity attribute (default to 0.3 m/s for headwater reaches < 5 cfs, 0.8 m/s for mid-order reaches, 1.5 m/s for high-order mainstem reaches where EROM is unavailable). Calculate cumulative time-to-reach for each downstream segment. Identify all perennial reaches (NHD FCODE 46006) vs. intermittent (46003) — AMD will concentrate in intermittent sections during low-flow.
3Identify and prioritize downstream receptors
Fetch EPA SDWIS Community Water Systems within the downstream flow corridor: filter to intakes within 1 km of the traced NHD flowlines and serving ≥ 25 people (SDWA Section 1433 threshold). Fetch EPA FRS regulated facilities (aquaculture, fish hatcheries, recreational swimming areas, tribal designated uses) within 500 m of the flow path. Query USEPA WATERS NWIS for any active water-quality monitoring stations on the downstream reach — these are the first indicators of AMD arrival. For each receptor, record: name, type, population served (for water systems), distance from breach, and estimated time-to-reach. Flag tribal water uses and critical habitat reaches (fetch from USFWS IPAC overlay) for Priority Receptor status.
4Estimate AMD loading and ecological impact by segment
If operator-provided tailings pH and sulfate concentration data are available, apply the simplified steady-state AMD dilution model: C_downstream = (C_AMD × Q_release) / (C_AMD × Q_release + C_background × Q_stream) where Q values are estimated from NHDPlus EROM mean annual flows. Target thresholds: pH < 6.0 triggers aquatic toxicity risk (EPA freshwater criterion); sulfate > 250 mg/L triggers secondary drinking water standard violation; iron > 0.3 mg/L triggers aesthetic impairment. If operator data are not available, apply worst-case AMD composition benchmarks from EPA AMD Treatment Cost Guide (pH 2.5–4.5, sulfate 1,000–5,000 mg/L) with clear caveat notation. Compute the stream reaches where each threshold is exceeded under breach-volume assumptions. Assemble citation block: NHDPlus HR data vintage, 3DEP DEM vintage, EPA SDWIS data pull date, EPA AMD Treatment Cost Guide (EPA/600/R-14/095), OSMRE AMD formation model, SDWA Section 1433 threshold, EPA freshwater sulfate criterion.
More in the Mining pack
- Claim staking overlayVerify any claim's overlap with active and abandoned claims.4 steps
- Tailings storage facility InSAR monitoringInSAR-based displacement monitoring for every TSF.4 steps
- Reclamation raster diffQuantify reclamation progress year-over-year.4 steps
- Drill-target prioritizationRank drill targets by geochem + structural fit.4 steps
- Ore-body 3D model updateUpdate the resource model with this quarter's drilling.4 steps
- Permit-boundary compliance auditVerify operations stay inside permit boundaries quarterly.4 steps