Ready-made workflow in the Transportation & Logistics pack
Traffic Impact Analysis for Development
Run trip generation, distribution, and network assignment for any proposed development in an hour.
Included in the Transportation & Logistics pack
$49 /seat/moJoin the waitlistThe pack includes 11 other ready-made workflows.
What it does
Performs a full ITE-compliant traffic impact analysis (TIA) for a proposed development — computing AM/PM peak trip generation, distributing trips using a gravity model, assigning to the network, and producing the intersection LOS comparison table required for site plan approval — replacing 3-4 weeks of consultant work that typically costs $25,000-$60,000 per TIA.
- Data it uses
- ITE Trip Generation Manual 11th Edition rate tables (built-in reference)
- TIGER/Line road network with functional classification for study area
- Census LODES/ACS commute pattern data for trip distribution
- Existing traffic count data (upload if available)
- Specialists on it
- Transportation Engineer, Urban Planner, GIS Analyst
The steps
Each step runs in order and shows its work as it goes. Open a step to read exactly what it asks for.
1Classify proposed development and retrieve ITE trip generation rates
Classify the proposed development by ITE Land Use Code (LUC) and retrieve the applicable trip generation rates. Common ITE LUCs: LUC 210 = Single-Family Detached Housing (ITE 11th Ed: AM peak rate = 0.70 trips/DU, PM peak rate = 0.99 trips/DU); LUC 220 = Multifamily Housing (Mid-Rise) (AM = 0.35/DU, PM = 0.44/DU); LUC 710 = General Office Building (AM = 1.56/1,000 sqft, PM = 1.49/1,000 sqft); LUC 820 = Shopping Center (AM = 0.96/1,000 sqft, PM = 3.81/1,000 sqft); LUC 110 = General Light Industrial (AM = 0.97/1,000 sqft, PM = 0.97/1,000 sqft); LUC 150 = Warehousing (AM = 0.32/1,000 sqft, PM = 0.32/1,000 sqft); LUC 853 = Convenience Store with Gas Station (PM = 789 trips/fueling position — very high generator). For mixed-use developments (ITE LUC 230 or multi-LUC): compute internal capture rate reduction per ITE MXD methodology (internal capture reduces external trips by 10-25% for well-designed mixed-use projects). Compute gross AM and PM peak hour vehicle trip ends (VTEs): gross_trips = rate × intensity (dwelling units or 1,000 sqft or per-unit measure). Apply ITE pass-by trip capture if applicable (LUC 820 shopping center PM pass-by capture = 34% per ITE 11th Ed) to compute new external trips. Report: LUC classification rationale, rate source (fitted curve vs. average rate — ITE recommends fitted curve where R² ≥ 0.75), gross VTEs by peak hour, net new external trips after internal capture and pass-by adjustment.
2Distribute trips using gravity model and assign to road network
Distribute the development's external peak hour trips across the road network using a gravity model calibrated to observed commute patterns. Trip distribution: (1) Identify the primary trip generators within the study area (employment centers, retail activity centers, freeway ramps) using Census LODES WAC (Workplace Area Characteristics) data for work trips and Census ACS commute patterns for home-based trips. (2) Apply Gravity Model: T_ij = P_i × [A_j / F_ij] / [Σ(A_j / F_ij)], where P_i = trip productions at site, A_j = employment or population attraction at zone j, F_ij = friction factor = 1 / (travel_time_ij ^ 2.0) (standard friction factor exponent for urban areas per NCHRP Report 187). This distributes trips proportionally to the attractiveness of each destination weighted by travel time. (3) Apply directional split to access points: compute % of trips approaching the site from each cardinal direction based on the gravity model zone assignments. (4) Assign distributed trips to the road network using all-or-nothing assignment (acceptable for TIA purposes per ITE TIA Guidelines 3rd Edition) — place all trips on the shortest path from the gravity model zone centroids to the site access points. Compute new trips added to each network segment and intersection approach. Report: top-5 affected road segments by added trip count, directional split at primary site access, and the study area boundary used for the gravity model.
3Compute before-and-after intersection LOS at study intersections
Compute intersection LOS for the required study intersections in both the existing (no-build) and proposed (build) conditions. Study intersection selection criteria per ITE TIA Guidelines 3rd Ed: all site driveways, all intersections within 600 ft of the site where the project adds ≥ 10 peak hour trips on any approach, and any intersection on the primary access route that is already operating at LOS D or worse. For each study intersection: (1) No-build volumes: use uploaded count data if available; otherwise apply a 1.5% annual growth rate to the most recent available HPMS volume data (standard in absence of local growth rate data). (2) Build volumes: no-build volumes + trip assignment from Step 2. (3) Signalized intersection LOS: apply HCM 7th Edition Chapter 19 simplified method. Control delay (sec/veh) per approach: use V/C ratio × saturation flow rate relationship. For planning-level TIA without detailed signal timing data, apply the following simplified delays by V/C ratio: V/C ≤ 0.60 → 15 sec (LOS B); 0.60-0.85 → 30 sec (LOS C); 0.85-0.95 → 45 sec (LOS D); 0.95-1.00 → 65 sec (LOS E); > 1.00 → > 80 sec (LOS F). (4) Unsignalized intersection LOS: compute critical movement delay for the minor-street left turn (worst-case movement) using HCM Chapter 20 gap acceptance methodology. Report: before-and-after LOS table for each study intersection with LOS grade and average control delay (sec/veh) in both conditions.
4Produce TIA report package for site plan submittal
Assemble the complete TIA report package in the format required for municipal site plan approval. Required TIA components (per ITE TIA Guidelines 3rd Ed. and standard local jurisdiction requirements): (1) Site plan context map: proposed site location, study area boundary, study intersections (numbered), existing road network with functional class and lane configuration, and all site access driveways. (2) Trip generation summary table: LUC, size/intensity, AM peak VTEs (in/out/total), PM peak VTEs (in/out/total), gross trips, internal capture adjustment, pass-by adjustment, net new external trips. (3) Trip distribution map: arrow diagram showing % directional distribution of site trips across the road network. (4) Traffic assignment map: road network showing existing + projected volumes with and without the project (AM and PM peak). (5) Intersection LOS comparison table: intersection name, control type (signal/stop), AM peak (existing V/C, LOS, delay; build V/C, LOS, delay; LOS change), PM peak (same format). Flag any intersection where the project causes a LOS change from D or better to E or F — these require mitigation measures. (6) Mitigation recommendations (for failing intersections): signal timing optimization (first option — no capital cost); turn lane addition (if V/C still > 0.95 after timing); grade separation (for V/C > 1.10 with committed development). Assemble citation block: ITE Trip Generation Manual 11th Ed. (ITE, 2021), HCM 7th Ed. (TRB, 2022), traffic count source and date, TIGER/Line vintage.
More in the Transportation & Logistics pack
- Last-mile coverage gap mapFind every ZIP code beyond your delivery network's reach.6 steps
- Optimal depot / distribution-center sitingScore candidate sites by weighted drive-time to demand.7 steps
- Freight corridor bottleneck analysisIdentify the top 10 pinch points in your distribution network by volume × travel time.6 steps
- EV fleet charging network sitingPlace charging stations to maximize coverage of your route fleet.6 steps
- School bus route optimizationMinimize total route distance while respecting walk-zone rules.7 steps
- Port-hinterland connectivity auditMap rail + truck access to every port's hinterland catchment.7 steps