Ready-made workflow in the Transportation & Logistics pack
Port-hinterland connectivity audit
Map rail + truck access to every port's hinterland catchment.
Included in the Transportation & Logistics pack
$49 /seat/moJoin the waitlistThe pack includes 11 other ready-made workflows.
What it does
Port authorities, shippers, and trade corridor planners need to understand the multimodal connectivity between port gates and the hinterland demand centers that drive cargo volumes. This template builds drive-time catchment areas from each port gate, overlays with rail terminal locations and intermodal connector quality, identifies hinterland demand clusters (freight-generating industrial zones and population centers), and scores the port's connectivity to each cluster by road, rail, and combined mode. Output is a connectivity scorecard and a catchment map suitable for port master planning and investment prospectus documents.
- Data it uses
- BTS National Transportation Atlas Database (NTAD) — rail + intermodal terminals
- OSM road network (truck routing)
- BTS Freight Analysis Framework (FAF5) — freight zones + volumes
- TIGER/Line roads
- Census County Business Patterns (industrial employment proxy)
- Specialists on it
- Transportation Engineer, Infrastructure Engineer, GIS Analyst
The steps
Each step runs in order and shows its work as it goes. Open a step to read exactly what it asks for.
1Validate port gate and hinterland layers
Verify {{port_gate_layer}} exists and report gate count and port names (if available). Verify {{hinterland_boundary}} exists and report its geographic extent. Flag if truck_drive_hours exceeds 12 — drive-time service areas beyond 12 hours are rarely operationally meaningful for truck hinterland analysis (drivers are subject to HOS regulations and 11-hour drive limits); recommend using 8 hours as the standard primary catchment. Report whether any port gates fall outside the hinterland_boundary — gates outside the boundary will produce catchment areas that extend beyond the study scope.2Generate truck catchment from port gates
Generate {{truck_drive_hours}}-hour drive-time service areas (dissolved) from {{port_gate_layer}} using the truck network. Clip to {{hinterland_boundary}}.3Identify rail-served hinterland zones
If {{rail_terminal_layer}} is available: generate 50-mile straight-line buffer from each rail terminal as a proxy for rail-accessible hinterland. Intersect with the truck catchment to identify dual-mode zones.4Score hinterland demand clusters
Within the truck catchment, group county-level FAF freight zones by total annual tonnage. Rank zones by total freight generated. Score connectivity: dual-mode zone = HIGH, truck-only = MEDIUM, outside catchment = LOW.
5Generate connectivity scorecard
Summarize: (1) % of hinterland freight volume within truck catchment, (2) % within dual-mode (truck + rail) zone, (3) top 5 freight-generating zones by connectivity gap. Format as a port master-planning summary table.
6QA catchment coverage and assemble citations
Report the percentage of total hinterland freight volume (tons/year) captured within the truck catchment area — if this percentage is below 40%, the port's hinterland reach is limited and the study should note this explicitly as a competitive disadvantage vs. ports with better road access. Report the percentage within dual-mode (truck + rail) zones — a dual-mode percentage above 50% is considered strong modal competition for the port's hinterland traffic. Identify the top-5 hinterland freight-generating zones that fall outside the truck catchment as the highest-priority underserved markets; report their annual tonnage and estimated distance to the nearest port gate. Assemble citation block: BTS FAF5 version and download date, NTAD rail terminal dataset vintage, OSM road network date and routing engine version.
7Publish connectivity map
Publish the port catchment and connectivity layers to AGOL. Show truck catchment in blue, dual-mode zone in green, freight demand clusters as graduated circles. Title: 'Port Hinterland Connectivity — {{port_gate_layer}}'.
More in the Transportation & Logistics pack
- Last-mile coverage gap mapFind every ZIP code beyond your delivery network's reach.6 steps
- Optimal depot / distribution-center sitingScore candidate sites by weighted drive-time to demand.7 steps
- Freight corridor bottleneck analysisIdentify the top 10 pinch points in your distribution network by volume × travel time.6 steps
- EV fleet charging network sitingPlace charging stations to maximize coverage of your route fleet.6 steps
- School bus route optimizationMinimize total route distance while respecting walk-zone rules.7 steps
- Level of Service (LOS) Traffic AnalysisScore every road segment in your study area by congestion — find the F grades before the public meeting.4 steps