Ready-made workflow in the Transportation & Logistics pack
Level of Service (LOS) Traffic Analysis
Score every road segment in your study area by congestion — find the F grades before the public meeting.
Included in the Transportation & Logistics pack
$49 /seat/moJoin the waitlistThe pack includes 11 other ready-made workflows.
What it does
Computes HCM Level of Service grades for every road segment in a study area using observed speed data and HPMS capacity, identifies failing (E/F grade) segments and intersections, and produces the LOS heat map and technical exhibit that traffic engineers currently spend 2-3 weeks assembling from multiple datasets before a transportation planning public hearing.
- Data it uses
- HERE HD Traffic speed data or INRIX TMC-level speed data (REST API)
- FHWA HPMS National Highway Performance Monitoring System (lane capacity by road class)
- TIGER/Line road network with functional classification
- Intersection turning movement counts (upload if available)
- Specialists on it
- Transportation Engineer, Urban Planner, GIS Analyst, Data Engineer
The steps
Each step runs in order and shows its work as it goes. Open a step to read exactly what it asks for.
1Fetch road network and validate speed data coverage
Obtain the road network and observed travel speed data for the study area. Road network: TIGER/Line roads filtered to the study area boundary, attributed with MTFCC functional classification codes (S1100 = Primary highway with limited access / interstate; S1200 = Primary road without limited access; S1400 = Local neighborhood road). HPMS capacity lookup by functional class for the study area URBANIZED AREA vs. RURAL designation (use FHWA HPMS 2022 default capacities per lane: Interstate = 2,000 PCE/hr/lane; Arterial (urban, multi-lane divided) = 1,600 PCE/hr/lane; Arterial (urban, 2-lane undivided) = 800 PCE/hr/lane; Collector (urban) = 600 PCE/hr/lane). Observed speed data: attempt to fetch HERE TMC or INRIX TMAS speed data via the available REST endpoint. Use AM peak hour (7-9am Tuesday-Thursday) and PM peak hour (4-6pm Tuesday-Thursday) — these define worst-case LOS conditions under HCM 7th Edition methodology. If speed data is not available via REST, fall back to FHWA NPMRDS (National Performance Management Research Data Set), which is publicly available for NHS routes. Validate: report road network coverage within study area boundary (lane-miles), speed data match rate to road segments (%), and any major arterials with missing speed observations (flagged for manual count supplementation).
2Compute volume-to-capacity ratios and HCM LOS grades by segment
Compute segment-level LOS grades using HCM 7th Edition methodology. Volume estimation from speed: use the BPR (Bureau of Public Roads) volume-delay function solved for volume: if observed speed V_obs and free-flow speed V_ffs are known, and assuming BPR alpha = 0.15 and beta = 4.0, then: V/C = [(V_ffs/V_obs − 1) / 0.15] ^ (1/4.0). Free-flow speed (V_ffs): use posted speed limit × 1.05 (HCM adjustment for below-posted-speed-limit free-flow conditions on urban arterials) or 1.0 × speed limit on interstates. Compute V/C ratio per segment and map to HCM LOS grade: LOS A = V/C ≤ 0.35 (free-flow, minimal delay); LOS B = 0.35-0.54 (stable flow); LOS C = 0.54-0.77 (stable flow, some restriction); LOS D = 0.77-0.93 (approaching unstable, acceptable for design in urban areas per AASHTO); LOS E = 0.93-1.00 (unstable, at capacity); LOS F = V/C > 1.00 (breakdown flow, forced stop-and-go). Flag: any segment where V/C > 1.10 is 'Severely Over Capacity' — these are the segments most likely to require capital improvement or demand management. Report: lane-mile distribution by LOS grade, count of LOS E + F segments, top-10 over-capacity segments by V/C ratio.
3Analyze intersection delay and identify bottleneck nodes
Identify intersection bottlenecks that compound segment LOS failures. Intersection analysis: (1) Identify all intersections along LOS D/E/F segments (network topology — all nodes where ≥ 2 arterial segments meet). (2) If turning movement counts (TMC data) were uploaded, compute signalized intersection delay using HCM 7th Edition Chapter 19 methodology: control delay (sec/veh) = uniform delay + incremental delay + initial queue delay. LOS at signalized intersections: A = 0-10 sec; B = 10-20 sec; C = 20-35 sec; D = 35-55 sec; E = 55-80 sec; F = > 80 sec. (3) Without TMC data, apply surrogate: intersections where ≥ 2 intersecting approaches are LOS D or worse are 'Probable Bottleneck Intersections' — recommend field count collection for detailed analysis. (4) Compute cumulative network impact: identify segments where upstream intersection backup extends the LOS F condition onto an otherwise LOS D segment (queue spillback). In dense grid networks, this is a common compounding mechanism. Report: count of probable bottleneck intersections, top-5 by estimated delay contribution, and whether any require turn-movement counts to confirm.
4Produce LOS heat map, priority segment list, and technical exhibit
Assemble the LOS technical deliverables suitable for transportation planning public hearings and NEPA scoping documents. Map outputs: LOS heat map — road segments symbolized by LOS grade using AASHTO standard colors (A = dark green, B = light green, C = yellow, D = orange, E = red, F = dark red / maroon). Scale at 1:24,000 (standard for transportation planning exhibits). Include: north arrow, scale bar, legend with LOS grade definitions, study area boundary, and AM vs. PM peak hour comparison panel. Report outputs: (1) LOS summary table: functional class × LOS grade distribution (lane-miles and % of network). Target LOS D or better for urban arterials per AASHTO Policy on Geometric Design (Green Book). (2) Deficiency segment list: all LOS E and F segments, sorted by V/C ratio, with: segment name/route, from/to cross streets, length (lane-miles), peak hour V/C ratio, LOS grade, functional class, adjacent land uses (from NLCD or zoning GIS). (3) Priority improvement candidates: top-10 deficient segments ranked by V/C ratio × affected ADT × proximity to employment or activity centers. For each: note likely improvement strategy (added capacity, signal timing optimization, demand management, or grade separation). (4) Methodology note for record: HCM 7th Edition, BPR volume estimation approach, speed data source and vintage, HPMS capacity defaults applied. Assemble citation block: HERE/INRIX speed data date range, HPMS vintage, TIGER/Line vintage.
More in the Transportation & Logistics pack
- Last-mile coverage gap mapFind every ZIP code beyond your delivery network's reach.6 steps
- Optimal depot / distribution-center sitingScore candidate sites by weighted drive-time to demand.7 steps
- Freight corridor bottleneck analysisIdentify the top 10 pinch points in your distribution network by volume × travel time.6 steps
- EV fleet charging network sitingPlace charging stations to maximize coverage of your route fleet.6 steps
- School bus route optimizationMinimize total route distance while respecting walk-zone rules.7 steps
- Port-hinterland connectivity auditMap rail + truck access to every port's hinterland catchment.7 steps