Ready-made workflow in the Forestry & Carbon pack
Forest Road Condition Prioritization
Prioritize road maintenance before the fall harvest — not after your loader gets stuck.
Included in the Forestry & Carbon pack
$59 /seat/moJoin the waitlistThe pack includes 11 other ready-made workflows.
What it does
Imports road networks with condition ratings, joins to planned harvest unit sequence, computes expected haul volume per segment, scores by condition × volume × road class, estimates per-segment repair cost, and outputs a maintenance priority queue — replacing the annual road walk with a data-driven maintenance plan.
- Data it uses
- Operator forest road network GIS with condition ratings
- Road condition inspection records (upload if available)
- Planned harvest unit sequence (from harvest schedule)
- Specialists on it
- Forest Resources Specialist, Infrastructure Engineer, GIS Analyst
The steps
Each step runs in order and shows its work as it goes. Open a step to read exactly what it asks for.
1Validate road network and condition data
Upload and validate the forest road network GIS — confirm required attributes: segment ID, road class (USFS Road Class 1–5 or equivalent state classification), surface type (native, aggregate, paved), current condition rating (if available, 1–5 scale), and last maintenance date. Report total road miles by road class and surface type. Flag road segments with condition rating below 3 (on a 1–5 scale) or with last maintenance date more than 5 years ago — these are candidates for the high-priority maintenance queue regardless of planned haul volume. Confirm network topology connectivity — report any disconnected segments that cannot be reached from a highway access point, as these require road construction or connection before they can be used for haul access.
2Compute expected haul volume per road segment
Build a routable network from the forest road GIS. For each planned harvest unit (from the harvest schedule or {{harvest_units_layer}}), solve the least-cost path from the unit landing to the highway access point. Tally the timber volume (MBF or loads) that will travel through each road segment. Compute total expected haul loads per segment: unit_volume / load_capacity_MBF. A single-lane native surface road typically begins showing fatigue after 25–50 loaded truck passes; aggregate surface roads handle 100–200 loads before significant rutting; paved roads are rated for 500+ loads before structural maintenance is needed. Flag segments projected to receive more loaded passes than their surface type's rated threshold.3Score maintenance priority and estimate repair cost
Compute maintenance priority score per segment: priority = (5 - condition_rating) × (projected_loads / rated_threshold) × road_class_weight, where road_class_weight = 2.0 for primary haul routes (road class 3+), 1.5 for secondary roads, 1.0 for spur roads. Rank segments by priority score. Classify maintenance action required by condition and surface type: (1) condition rating 4–5 with loads within rated threshold: no action needed; (2) condition rating 3 with loads near threshold: routine surface grading ($500–1,200/mile); (3) condition rating 2 with projected loads exceeding threshold: drainage improvement + compaction ($2,000–5,000/mile); (4) condition rating 1 with any projected haul: road reconstruction required ($8,000–25,000/mile). Compute total estimated maintenance cost for all priority segments.
4QA maintenance plan and assemble citations
Report the total road miles by maintenance action class and the total estimated maintenance cost. Compare to the {{maintenance_budget}} if provided — if the required maintenance exceeds budget, prioritize segments on the primary haul routes serving the highest-value harvest units. Flag any road segment that carries the only access to a harvest unit AND has condition rating 1 (requiring reconstruction) — this segment represents a harvest gate; without maintenance investment, the harvest unit is inaccessible and the timber value cannot be realized. Report seasonal timing: identify which maintenance tasks must be completed before the first scheduled harvest entry and which can be deferred to after the harvest season. Assemble citation block: road GIS upload date, condition inspection record source and date, harvest unit layer source.
More in the Forestry & Carbon pack
- Stand-volume cruise from LiDARReplace 200 hours of cruising with one batch run.4 steps
- Wildfire fuel-treatment priorityRank treatment units by ROI per acre.5 steps
- Carbon-credit MRV packGenerate Verra/Gold-Standard-ready MRV reports.5 steps
- Riparian buffer complianceAudit harvest plans against state riparian rules.4 steps
- Forest inventory annual updateRefresh your CFI plots from this year's imagery.4 steps
- Beetle-kill detectionDetect bark-beetle stands from Sentinel-2 before crew arrival.4 steps