Ready-made workflow in the Forestry & Carbon pack
Beetle-kill detection
Detect bark-beetle stands from Sentinel-2 before crew arrival.
Included in the Forestry & Carbon pack
$59 /seat/moJoin the waitlistThe pack includes 11 other ready-made workflows.
What it does
Bark beetle defoliation shows in NDVI + NDMI. This template detects red-stage and gray-stage stands.
- Data it uses
- Sentinel-2 L2A
- Stand boundaries
- Specialists on it
- Forest Resources Specialist, Remote Sensing Specialist, Field Biologist
The steps
Each step runs in order and shows its work as it goes. Open a step to read exactly what it asks for.
1Inspect Sentinel-2 endpoint and verify baseline availability
Call inspect_rest_endpoint on the Sentinel-2 imagery service. Confirm a healthy-year baseline scene (prior to the current outbreak if known, otherwise 3-year median) is available for the stand network extent. Report current-scene cloud cover per stand. Flag stands with > 20% cloud cover as requiring the previous clear scene.
2Detect red-stage
Compute NDVI + NDMI deltas vs baseline; threshold for red-stage.
3Stand roll-up
Zonal mean of red-stage proportion per stand; flag >20%.
4QA detections and assemble citations
Report total stands analyzed, count flagged at each severity tier (> 20%, > 50%, > 80% red-stage), and total flagged acres. Verify flagged stands are not coincident predominantly with known clearcuts or harvest units — those would be false positives. Assemble citation block: Sentinel-2 scene date and tile, baseline scene date, NDVI/NDMI threshold values applied, and source URL.
More in the Forestry & Carbon pack
- Stand-volume cruise from LiDARReplace 200 hours of cruising with one batch run.4 steps
- Wildfire fuel-treatment priorityRank treatment units by ROI per acre.5 steps
- Carbon-credit MRV packGenerate Verra/Gold-Standard-ready MRV reports.5 steps
- Riparian buffer complianceAudit harvest plans against state riparian rules.4 steps
- Forest inventory annual updateRefresh your CFI plots from this year's imagery.4 steps
- Reforestation success monitoringTrack stocking success year-over-year.4 steps