Ready-made workflow in the Agriculture pack
Tile Drainage Inspection Priority Routing
Send your drainage technician to the tiles most likely failing right now — not the newest ones.
Included in the Agriculture pack
$29 /seat/moJoin the waitlistThe pack includes 13 other ready-made workflows.
What it does
Computes field-level soil water saturation from USDA WSS and precipitation, intersects with the tile drainage network, weights by tile age and failure history, and clusters failing tile segments for technician routing — replacing the guesswork with a data-driven inspection schedule.
- Data it uses
- USDA Web Soil Survey soil water saturation data
- NOAA PRISM precipitation data (past 30 days)
- Tile drainage network GIS (upload)
- Specialists on it
- Precision Agronomist, Hydrologist, GIS Analyst
The steps
Each step runs in order and shows its work as it goes. Open a step to read exactly what it asks for.
1Validate drainage network and fetch saturation data
Upload and validate the tile drainage network GIS — confirm it has segment IDs, installation year (or estimate), pipe diameter, and depth. Flag segments where installation year is unknown — these cannot be age-weighted and will receive a neutral age score. Fetch USDA Web Soil Survey (WSS) soil saturation data for the study area — specifically the 'hydric soil' designation and available water capacity (AWC) by map unit. Fetch PRISM or NOAA precipitation data for the past 30 days and compute cumulative precipitation. The combination of high-AWC soils with above-normal precipitation creates the saturation conditions that stress tile drainage infrastructure.
2Compute soil water saturation index by field
For each tile segment, compute the contributing field area (the upslope area drained by that segment). Using the soil-water balance model: saturation_index = (cumulative_30day_precip / mean_30day_et) × (AWC_soil / AWC_max) × hydric_soil_fraction. A saturation_index above 1.5 indicates soils are near or above field capacity. Overlay the saturation_index on the tile drainage network — segments draining saturated zones are under hydraulic pressure and are more likely to have failed joints, crushed sections, or blocked laterals. Weight the saturation risk by segment slope: flat tile segments (< 0.3% grade) accumulate water and are at higher failure risk than sloped segments.
3Prioritize segments by age, failure history, and saturation risk
Compute a composite failure risk score for each tile segment: risk = (saturation_index × 0.4) + (age_score × 0.3) + (failure_history_score × 0.3), where age_score = min(1.0, tile_age_years / 40) (assuming 40-year design life; most clay tile has a 30–50 year service life depending on installation quality) and failure_history_score = 2.0 if prior failure on segment, 0.5 if no history. Cluster high-risk segments (risk > 0.6) by geographic proximity for routing efficiency. Compute an optimized crew route through the high-risk clusters from {{technician_depot}}. Report estimated inspection time: 30 minutes per tile access point plus travel time.4QA inspection priority list and assemble citations
Report the total tile network mileage, the number of segments classified as high-risk, and the total estimated inspection days. Flag segments where tile age exceeds 50 years — clay tile installed before the 1980s is at high risk of root intrusion and collapse; these segments should be prioritized regardless of current saturation index, as they are structurally compromised. Report the cost-effectiveness of the prioritized inspection schedule: estimate the cost of proactive inspection ($150/access point × identified high-risk access points) vs. the cost of emergency tile repair ($3,000–8,000 per failure event including crop damage from undetected blockage). Assemble citation block: USDA WSS soil data vintage and download date, PRISM precipitation data download date and coverage period, tile network GIS upload date.
More in the Agriculture pack
- Variable-rate prescription generationGenerate VR scripts from satellite + soil overnight.4 steps
- Field NDVI anomaly detectionSurface every distressed acre across your portfolio weekly.4 steps
- Crop-insurance acreage verificationMatch every reported acre to satellite-verified acres.4 steps
- Cover-crop adoption trackingVerify cover-crop adoption for carbon-program payouts.4 steps
- Pivot irrigation overlap auditFind every over-watered pivot in your portfolio.4 steps
- Drainage tile mappingDetect drainage tile networks from drone or LiDAR.4 steps