Ready-made workflow in the Agriculture pack
Drainage tile mapping
Detect drainage tile networks from drone or LiDAR.
Included in the Agriculture pack
$29 /seat/moJoin the waitlistThe pack includes 13 other ready-made workflows.
What it does
LiDAR + post-rain thermal imagery exposes buried tile networks. This template identifies linear thermal anomalies that align with tile spacing.
- Data it uses
- USGS 3DEP LiDAR
- Drone or thermal imagery
- Field boundaries
- Specialists on it
- Precision Agronomist, Remote Sensing Specialist, GIS Analyst
The steps
Each step runs in order and shows its work as it goes. Open a step to read exactly what it asks for.
1Validate imagery extent and post-rain timing
Verify the thermal or drone imagery extent covers all target field boundaries. Confirm imagery was acquired within 48 hours of a rainfall event (check image metadata acquisition date vs NOAA precipitation records if available). Report imagery resolution and flag fields where coverage is < 100% before running anomaly detection.
2Detect linear anomalies
Apply Sobel + Hough transforms to post-rain thermal imagery.
3Vectorize
Convert detected lines to a polyline tile-network layer.
4QA tile network and assemble citations
Report total detected tile line length per field and average tile spacing. Flag fields where detected spacing is < 20 ft or > 120 ft as likely anomaly artifacts requiring ground-truth verification. Assemble citation block: imagery acquisition date, sensor type and resolution, USGS 3DEP tile source, and detection method description.
More in the Agriculture pack
- Variable-rate prescription generationGenerate VR scripts from satellite + soil overnight.4 steps
- Field NDVI anomaly detectionSurface every distressed acre across your portfolio weekly.4 steps
- Crop-insurance acreage verificationMatch every reported acre to satellite-verified acres.4 steps
- Cover-crop adoption trackingVerify cover-crop adoption for carbon-program payouts.4 steps
- Pivot irrigation overlap auditFind every over-watered pivot in your portfolio.4 steps
- Yield zone delineationBuild management zones from 5 years of yield monitor data.4 steps