Ready-made workflow in the Insurance pack
Post-event adjuster dispatch queue
Rank every insured in the event footprint by damage severity — before adjusters leave.
Included in the Insurance pack
$99 /seat/moJoin the waitlistThe pack includes 15 other ready-made workflows.
What it does
After a CAT event (hurricane, hail, tornado, wildfire), claim managers need to dispatch adjusters to the highest-severity claims first — not by claim receipt order. This template ingests the event footprint (NWS or SPC), intersects the insured portfolio, estimates damage severity by peril intensity class and construction type, and produces a geographically clustered adjuster dispatch queue that minimizes travel time while prioritizing high-TIV severe-damage claims.
- Data it uses
- NWS/SPC CAT event footprint (hail, wind, tornado paths)
- NOAA NHC hurricane track + wind radii
- FEMA NRI vulnerability index
- Internal portfolio locations + construction class
- Specialists on it
- Risk & Exposure Analyst, Remote Sensing Specialist, GIS Analyst
The steps
Each step runs in order and shows its work as it goes. Open a step to read exactly what it asks for.
1Validate portfolio and event footprint inputs
Verify the portfolio layer exists with location coordinates, TIV, and construction_class fields. Verify the event footprint layer exists and report its event type (hail/wind/hurricane/wildfire), date, and geographic extent. Flag if the event footprint does not overlap with the portfolio extent — an empty intersection means either the wrong footprint layer was loaded or the portfolio has no exposure in the affected area. Report total portfolio accounts within the event bounding box before running the precise intersection.
2Intersect portfolio with event footprint and intensity bands
Intersect the portfolio with the event footprint. Assign EVENT_INTENSITY based on the footprint's intensity field (e.g., hail size, wind speed band, fire intensity class). For hail: >= 2" = High, 1–2" = Moderate, < 1" = Low. For wind: >= 100 mph = High, 65–100 mph = Moderate, < 65 mph = Low. For fire: active flame zone = High, smoke/ember = Moderate. Retain all matching portfolio attributes.
3Estimate damage severity by intensity and construction class
Calculate DAMAGE_SEVERITY_SCORE = EVENT_INTENSITY_SCORE × CONSTRUCTION_VULNERABILITY_FACTOR. Apply construction factors: wood frame = 1.3, masonry = 0.9, steel frame = 0.7, manufactured = 1.5. Multiply by TIV to produce ESTIMATED_LOSS_INDICATOR. This is not a final loss estimate — it is a triage priority index.
4Cluster accounts into adjuster dispatch zones
Using DBSCAN spatial clustering, group impacted accounts into geographic dispatch zones of no more than 50 accounts per zone. Within each zone, rank accounts by ESTIMATED_LOSS_INDICATOR descending. Assign ZONE_ID and PRIORITY_RANK within zone. Report number of zones and average estimated loss per zone.
5QA coverage and assemble citations
Report total accounts in dispatch queue, total estimated TIV exposed, and distribution by EVENT_INTENSITY tier. Verify that the top 10% of accounts by ESTIMATED_LOSS_INDICATOR represent a disproportionate share of total estimated loss (this is typical in CAT events and validates the triage model). Flag any accounts with null construction_class — these default to wood frame and may be misclassified. Assemble citation block: event footprint source (NWS storm event IDs, SPC archive date, or NHC advisory number), FEMA NRI version, portfolio data extraction timestamp.
More in the Insurance pack
- WUI exposure scoringQuantify Wildland-Urban-Interface exposure in your renewal portfolio overnight.4 steps
- Claim-cluster fraud detectionSurface fraud rings hiding in your loss file with DBSCAN spatial clustering.3 steps
- Wildfire portfolio exposureRe-underwrite your CA book against today's perimeters before market close.5 steps
- Flood-zone reclassification diffFind every loan that just changed flood-zone class — in 90 seconds.5 steps
- Hail swath damage projectionPre-place adjusters within four hours of a hail event.5 steps
- Earthquake liquefaction overlayStress-test your portfolio against the next M7 on the Hayward fault.6 steps